MEC19-04768
| Conference | 4/22/2020 | 4/22/2020 | 4/22/2020 10:11:39 AM | A | DONE |
|
|
Went by to meet Ben and look at the dryer duct design. I called and spoke with the Engineer about the dryer vents. Genral Contractor will send in an RFI and he will respond to it. Sounds like they are probably going to switch them to individule 4" rounds.
|
MEC20-00339
| Final | 4/20/2020 | 4/22/2020 | 4/22/2020 8:54:12 AM | A | FAIL |
|
|
access code for entry should be 4224 or 2529 Phone #: ###-#### Inspection requested via web by Angie Maguire - Need to connect gas line to water heater
|
MEC20-01038
| Rough-in | 4/21/2020 | 4/22/2020 | 4/22/2020 8:44:14 AM | A | CANC |
|
|
ADAM ###-#### Phone #: ###-#### Inspection requested via web by Mike Almanza - Need to reschedule for Friday
|
MEC20-00146
| Final | 4/21/2020 | 4/22/2020 | 4/22/2020 8:28:30 AM | A | PASS |
|
|
Mechanical Gas Fireplace Final Inspection. Manual is in kitchen drawer right of stove top area, Garage Code: 4224 Phone #: ###-#### Inspection requested via web by Dan Otero
|