MEC20-00086
| Final | 4/22/2020 | 4/22/2020 | 4/22/2020 3:46:44 PM | P | FAIL |
|
|
Garage code 2583 Phone #: ###-#### Inspection requested via web by Loren Bailey - line set insulation at outdoor unit needs repaired and UV protected
|
MEC19-05665
| Final | 4/22/2020 | 4/22/2020 | 4/22/2020 3:46:31 PM | P | FAIL |
|
|
2583 Garage code Phone #: ###-#### Inspection requested via web by Loren Bailey - line set insulation at outdoor unit needs repaired and UV protected
|
MEC20-00101
| Final | 4/22/2020 | 4/22/2020 | 4/22/2020 3:08:23 PM | P | FAIL |
|
|
contractor there, or door under deck open Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING - need sediment trap after shut off valve at unit heater - gas line at meter needs supported
|
MEC20-01544
| Rough-in | 4/21/2020 | 4/22/2020 | 4/22/2020 2:33:04 PM | P | PART |
|
|
Only a partial inspection on vent section from draft stop up to roof penetration. Phone #: ###-#### Inspection requested via web by Mike Almanza - Partial R/I on wood fireplace only. Fireplace venting from draft stop into attic and through roof line clearances ok. Insulation shield ok. Both fireplaces will need to be left uncovered for inspection at a later date once appliances arrive onsite.
|
MEC19-02327
| Rough-in | 4/22/2020 | 4/22/2020 | 4/22/2020 1:49:33 PM | P | PASS |
|
|
Please call Ted at least 30 min prior to inspection, prepared for video chat if needed, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum 1st floor East 2 bathroom hard lid R/I cover ok 2nd floor East 1- bathroom hard lid R/I cover ok
|
MEC20-01540
| Pressure Test | 4/21/2020 | 4/22/2020 | 4/22/2020 11:04:26 AM | A | PASS |
|
|
UNITS # 1955, 1953, 1951 INSTALLER JAMES ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt 3- 20lb gas pressure tests ok for clean backfill
|
MEC19-05479
| Final | 4/21/2020 | 4/22/2020 | 4/22/2020 10:39:47 AM | A | DONE |
|
|
garage code 6117 enter 1 sam- project manager Phone #: ###-#### Inspection requested via web by Aaron Alandt - Talked with Homeowner about the hold on occupied home inspections. -Due to COVID-19 the City of Boise has suspended inspections inside occupied dwellings until after 5-1-20. This date may be extended. Please call ###-#### to reschedule your inspection after 5-1-20.
|
MEC20-01570
| Rough-in | 4/21/2020 | 4/22/2020 | 4/22/2020 10:11:38 AM | A | PASS |
|
|
SAM ###-#### Phone #: ###-#### Inspection requested via web by Mike Almanza - fireplace R/I ok
|
MEC20-01482
| Final | 4/22/2020 | 4/22/2020 | 4/22/2020 9:50:07 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by JENNIFER MONTAGUE - final ok - occ card signed
|
MEC19-02877
| Mec-Aging Inspection | 4/22/2020 | 4/22/2020 | 4/22/2020 9:13:13 AM | | FAIL |
|
|
Called contractor about their aging permit. Permit will expire at next mechanical aging inspection if not active. Pictures of corrections will be ok
|
MEC20-01536
| Rough-in | 4/21/2020 | 4/22/2020 | 4/22/2020 9:07:37 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Lindsey Stegemann - fireplace R/I ok
|
MEC20-01506
| Rough-in | 4/21/2020 | 4/22/2020 | 4/22/2020 9:07:18 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino - 20lb gas pressure test fail - gas line at meter needs supported - line set arma flex insulation needs repaired in wall 2nd floor - need building inspector's approval for floor joists being cut
|
MEC20-01506
| Pressure Test | 4/21/2020 | 4/22/2020 | 4/22/2020 9:05:07 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino - 20lb gas pressure test fail
|
MEC19-05665
| Final | 4/21/2020 | 4/22/2020 | 4/22/2020 7:33:33 AM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Loren Bailey Inspection cancelled from web by: Loren Bailey
|