BLD01-00898
| BLD-Foundation | 4/22/2001 | 4/23/2001 | 4/23/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/22/2001 at 18:06:28. Contact: ###-####....needs condition "2" at sw's on 1st fl 4/23/2001 10:48:28 AM
|
BLD01-00902
| BLD-Foundation | 4/22/2001 | 4/23/2001 | 4/23/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/22/2001 at 18:08:42. Contact: ###-####...plans unclear as to sw's...eng'd or city alternate??? 4/23/2001 10:50:52 AM
|
BLD01-00848
| BLD-Conference | 4/23/2001 | 4/23/2001 | 4/23/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 4/23/2001 11:18:52 AM w/ concrete contractor...need eng'g onsite for verification of proper design and application for site due to excess organics and irrig lateral
|
BLD01-00379
| BLD-Conference | 4/23/2001 | 4/23/2001 | 4/23/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 4/23/2001 11:21:23 AM w/ Chris Walton re soils & spec insps: need approvals for actual site excavations & reinf'd concrete, not just cylinders. Will verify w/ DJO
|
BLD00-03195
| BLD-Framing/Rough-in | 4/23/2001 | 4/23/2001 | 4/23/2001 12:00:00 AM | P | PART |
|
|
shear nail justin ###-#### ext nailing ok 4/23/2001 3:50:32 PM
|
BLD00-00514
| BLD-Conference | 4/23/2001 | 4/23/2001 | 4/23/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 4/23/2001 2:09:26 PM rec'd eng's approval letter & MTI's affidavit.... all discrepancies ok'd by eng'r
|
BLD01-00245
| BLD-Conference | 4/23/2001 | 4/23/2001 | 4/23/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 4/23/2001 4:56:43 PM w/415 re c/n...sthd14s ok at front panel
|
BLD01-00691
| BLD-Foundation | 4/23/2001 | 4/23/2001 | 4/23/2001 12:00:00 AM | P | PART |
|
|
###-####...steel in place, ok to set hds 4/23/2001 3:08:16 PM
|
BLD00-03157
| BLD-Footing | 4/23/2001 | 4/23/2001 | 4/23/2001 12:00:00 AM | P | PART |
|
|
dwayne ###-####;steel in place, sst bolts onsite, ok to set. Need insulate slab per B.E.C. 4/23/2001 4:52:42 PM
|
BLD01-00223
| BLD-Footing | 4/23/2001 | 4/23/2001 | 4/23/2001 12:00:00 AM | P | PART |
|
|
###-####; pour at own risk, need eng's formal statement for soils...has MTI's written report & recommendation, follow up w/ stamped letter 4/23/2001 4:46:14 PM
|
BLD00-02379
| BLD-Final | 4/20/2001 | 4/23/2001 | 4/23/2001 12:00:00 AM | P | PASS |
|
|
Don - ###-#### - final reinspect ok for c/o, ramp ok 4/23/2001 11:51:09 AM
|
BLD01-00848
| BLD-Footing | 4/20/2001 | 4/23/2001 | 4/23/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 04/20/2001 at 14:34:08. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 04/23/2001 at 11:14:51.
|