BLD98-01343
| BLD-Conference | 4/22/2002 | 4/23/2002 | 4/23/2002 12:00:00 AM | A | PART |
|
|
check out what is needed for a final, Gwen @ ###-#### 4/22/2002 2:49:23 PM
made a partial list for gwen on issues and procedure to get a final inspection to help her out, ///no approved plans on site 4/23/2002 3:40:14 PM
|
BLD01-02528
| BLD-Conference | 4/22/2002 | 4/23/2002 | 4/23/2002 12:00:00 AM | A | PART |
|
|
FOR CONF CHAD ###-####
conf. on final 4/23/2002 10:54:04 AM
|
BLD01-03009
| BLD-Framing/Rough-in | 4/22/2002 | 4/23/2002 | 4/23/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/22/2002 at 16:37:11. Contact: ###-####.
ext. shear nailing ok except need fix from sruct. engineer on hd by front door and 4x material on shearwall #4 4/23/2002 3:57:33 PM
|
BLD02-00203
| BLD-Final | 4/22/2002 | 4/23/2002 | 4/23/2002 12:00:00 AM | A | PASS |
|
|
BRETT ###-####
|
BLD02-00203
| BLD-Final | 4/22/2002 | 4/23/2002 | 4/23/2002 12:00:00 AM | P | PASS |
|
|
BRETT ###-####
|
BLD01-02338
| BLD-Framing/Rough-in | 4/23/2002 | 4/23/2002 | 4/23/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 04/23/2002 at 08:36:01. Contact: ###-####.
|
BLD01-02346
| BLD-Framing/Rough-in | 4/23/2002 | 4/23/2002 | 4/23/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/23/2002 at 08:37:04. Contact: ###-####.
alt. hds ok 4/23/2002 4:28:55 PM
|
BLD01-02888
| BLD-Framing/Rough-in | 4/23/2002 | 4/23/2002 | 4/23/2002 12:00:00 AM | P | FAIL |
|
|
###-#### JUSTIN
need approved plans 4/23/2002 4:46:28 PM
|
BLD98-01343
| BLD-Conference | 4/23/2002 | 4/23/2002 | 4/23/2002 12:00:00 AM | P | PART |
|
|
call gwen first 4/23/2002 11:23:26 AM
see other notes 4/23/2002 4:44:46 PM
|
BLD01-03009
| BLD-Conference | 4/23/2002 | 4/23/2002 | 4/23/2002 12:00:00 AM | P | PART |
|
|
conference on winder stairs 4/23/2002 11:30:15 AM
w/ G.SLANE, stairs as they are do not meet code now, need to at frame inspection 4/23/2002 4:42:19 PM
|