BLD02-00723
| BLD-Foundation | 4/22/2002 | 4/23/2002 | 4/23/2002 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 04/22/2002 at 08:34:48. Contact: ###-####.
|
MEC02-01074
| Pressure Test | 4/22/2002 | 4/23/2002 | 4/23/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/22/2002 at 13:23:22. Contact: ###-####.
|
MEC02-00889
| Rough-in | 4/22/2002 | 4/23/2002 | 4/23/2002 12:00:00 AM | A | CANC |
|
|
###-####
|
BLD02-00142
| BLD-Final | 4/22/2002 | 4/23/2002 | 4/23/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/22/2002 at 15:28:36. Contact: ###-####. furnace in bathroom inclosure not per code 4/23/2002 9:39:44 AM
|
BLD02-00412
| BLD-Framing/Rough-in | 4/22/2002 | 4/23/2002 | 4/23/2002 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 04/22/2002 at 18:57:03. Contact: ###-####.
|
MEC02-01074
| Rough-in | 4/23/2002 | 4/23/2002 | 4/23/2002 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 425 On 4/23/2002 9:04:31 AM
|
BLD02-00412
| BLD-Framing/Rough-in | 4/23/2002 | 4/23/2002 | 4/23/2002 12:00:00 AM | A | FAIL |
|
|
Added by Inspector: 425 On 4/23/2002 10:18:38 AM c/n on site ok to insulate
|
MEC02-00813
| Final | 4/23/2002 | 4/23/2002 | 4/23/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD01-02575
| BLD-Framing/Rough-in | 4/23/2002 | 4/23/2002 | 4/23/2002 12:00:00 AM | P | PART |
|
|
Added by Inspector: 425 On 4/23/2002 1:45:49 PM 1hr wall second floor up to bottom of roof ok ceiling grid ok to place tiles
|
BLD01-02575
| BLD-Final | 4/23/2002 | 4/23/2002 | 4/23/2002 12:00:00 AM | P | NR |
|
|
fn insp butch ###-####
|
MEC02-00510
| Final | 4/23/2002 | 4/23/2002 | 4/23/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/23/2002 at 08:38:31. Contact: ###-####.
|
BLD01-02339
| BLD-Final | 4/22/2002 | 4/23/2002 | 4/23/2002 12:00:00 AM | P | PASS |
|
|
KIM ###-#### PLEASE CALL BEFORE GOING OUT
|
MIS02-00105
| BLD-Final | 4/22/2002 | 4/23/2002 | 4/23/2002 12:00:00 AM | P | NH |
|
|
|