Inspections for the day of: Wednesday, April 23, 2003.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR02-00447 INSP-Final Inspection4/21/20034/23/20034/23/2003 12:00:00 AMAPASS
This is Grants Cell; Phone #: ###-#### Internet Inspection Request from: Terry Owsley
BLD02-02200 BLD-Conference4/22/20034/23/20034/23/2003 12:00:00 AMADONE
I spoke with Charlie at simplexgrinnell and he said that they would get the inspection called in as soon as possible 4/25/2003 10:46:40 AM
BLD02-01845 BLD-Final4/23/20034/23/20034/23/2003 12:00:00 AMAFAIL
There is now access to the link for the fire door but while I was performing the inspection, Hobson Mechanical was installing a duct smoke detector. The plans show the unit at only 1850 cfm but per this contractor the mechanical engineer stated it was actually over 2000 cfm and to install a duct smoke detector. I won't final until it is installed and tested.
FIR02-00385 INSP-Final Inspection4/22/20034/23/20034/23/2003 12:00:00 AMPFAIL
Remove batt insulation in attic space over the maint. shop, provide map for fire alarm system, upright sprinkler heads in the attic space over the maint. shop appear to be blocked by truss panels 4/23/2003 3:34:31 PM
BLD02-01925 FIRE-Final Inspection4/22/20034/23/20034/23/2003 12:00:00 AMPFAIL
doug; Phone #: ###-#### Can not final the life safety until the fire sprinkler deficiencies have been taken care of. All life safety items are OK 4/23/2003 3:36:11 PM
FIR02-00385 INSP-Sprinkler Rough-in/Hydro4/22/20034/23/20034/23/2003 12:00:00 AMPPASS
need to complete air test; 40.5 psi and cooler at -22 degrees F. Air test is OK 4/23/2003 3:31:15 PM
FIR02-00473 INSP-Final Inspection4/22/20034/23/20034/23/2003 12:00:00 AMPFAIL
TODD; Phone #: ###-#### Sprinkler heads are overspaced in the existing lobby, hangers to be attached to the top of the structure (see the detail on the approved drawings), provide eq straps on all piping in th escope of work, installation does not match approved plans. Review notes appear to state the max. head spacing to be 149 sq. ft. Pendants in the lobby exceed this. Provide approved drawings with the 1/6/03 date on them. These drawings are showing the work in the lobby area. The previous resubmittal drawings show existing heads only. The pendants installed now don't even match those locations 4/23/2003 10:13:52 AM