FIR06-00958
| INSP-Sprinkler Rough-in | 4/20/2007 | 4/23/2007 | 4/24/2007 1:58:41 PM | P | PASS |
|
|
Third floor wet system and dry system hydro test passed.
|
FIR06-00941
| INSP-Sprinkler Rough-in | 4/19/2007 | 4/23/2007 | 4/23/2007 5:59:04 PM | P | PASS |
|
|
The fire pump acceptance test passed. Turning the first automatic startup the fire pump experienced phase loss but was not repeated.
|