Inspections for the day of: Wednesday, April 23, 2008.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJames Rogers
TitleEROSION CONTROL INSPECTOR
Phone #794-9463
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC06-00711 Random Inspection4/14/20084/23/20084/23/2008 1:38:36 PMAPASS
ESC07-00003 Site Preparation4/14/20084/23/20084/23/2008 1:19:47 PMAPASS
Some minor trackout.
ESC07-01556 Site Preparation4/16/20084/23/20084/23/2008 11:01:02 AMAPASS
ESC06-01389 Site Final4/16/20084/23/20084/23/2008 10:59:03 AMAFAIL
Final site stabilization (landscaping) not completed.
ESC07-00162 Random Inspection4/16/20084/23/20084/23/2008 10:49:26 AMAFAIL
A note was left for homeowner that contained:

Reference your phone call to Boise City. An ESC permit was issued on this address 2/9/07. The permit is still active, as final site stabilization on back side of property has not been completed. There is still a potential for soil from this uncompleted work to move into Crane Creek below your property.

Until landscaping, etc. has been completed on back of property, this permit will remain active.
ESC07-01186 Site Preparation4/16/20084/23/20084/23/2008 10:35:19 AMAFAIL
Landscaping has not been placed on property frontage.
ESC07-01300 BMP Violation4/22/20084/23/20084/23/2008 10:28:42 AMAPASS
ESC08-00099 Site Preparation4/23/20084/23/20084/23/2008 10:08:13 AMPPASS
ESC07-01561 Tracking Control4/23/20084/23/20084/23/2008 9:58:14 AMPFAIL
Where is the rock construction entrance?

Left CN with Mr. Klein, site manager. Excessive track out from construction site entrance on S. Findley. Directed contractor to sweep and clean gutters and sidewalk on both sides of Findley, build a construction site entrance of material meeting BMP specifications for a construction site entrance on S. Findley and on entrance off of Federal Way. Work to be completed by close of business today or a stop work order will be issued.