FIR09-00167
| INSP-Final Inspection | 4/23/2009 | 4/23/2009 | 4/29/2009 3:50:03 PM | P | PASS |
|
|
permit finaled.
|
FIR09-00179
| INSP-Sprinkler Rough-in | 4/23/2009 | 4/23/2009 | 4/23/2009 10:16:41 AM | P | PART |
|
|
See the city approved plans for the piping locations above the hard lid ceilings that are ok to cover. Per discussion with Leroy and Christina the remaining rough-in inspection will be called in next week when the earthquake bracing, wire branchline restraints and insulation at the deck have been installed.
|
BLD09-00548
| FIRE-Final Inspection | 4/22/2009 | 4/23/2009 | 4/23/2009 10:10:49 AM | A | PASS |
|
|
life safety passed
|
FIR09-00160
| INSP-Supply line flush | 4/22/2009 | 4/23/2009 | 4/23/2009 10:10:03 AM | A | PASS |
|
|
the underground supply flush passed
|
FIR09-00010
| FIR-Aging Inspection | 4/23/2009 | 4/23/2009 | 4/23/2009 9:45:45 AM | | NR |
|
|
Work is in progress
|
BLD08-01791
| FIRE-Final Inspection | 4/22/2009 | 4/23/2009 | 4/23/2009 9:26:01 AM | A | FAIL |
|
|
Provide current inspection tags for the fire extinguishers and provide exit discharge lighting as per the approved plans.
|
FIR09-00019
| INSP-Final Inspection | 4/22/2009 | 4/23/2009 | 4/23/2009 8:38:13 AM | A | PASS |
|
|
Permit finaled.
|