ESC09-00087
| Site Preparation | 4/23/2009 | 4/23/2009 | 4/24/2009 3:53:34 PM | P | PART |
|
|
Verbal with RP: Locaate the direction of construction traffic flow. Protect the storm drains within the area of the traffic flow. Will re-inspect on 4/28/09AM
|
ESC08-00491
| General Inspection | 4/22/2009 | 4/23/2009 | 4/23/2009 4:42:02 PM | P | FAIL |
|
|
Correction Notice: 1. Clean up all hard surfaces of all sediment and debris within the gutterpan on the perimeter of the project
|
ESC09-00137
| Site Preparation | 4/23/2009 | 4/23/2009 | 4/23/2009 4:13:17 PM | P | FAIL |
|
|
Message for RP: 1 Clean up parking lot of all sediment and debris. 2. Post ESC sign 3. Protect all stock pile of gravel and pit run. Will re-inspect on 4/27/09.
|
ESC08-00354
| General Inspection | 4/23/2009 | 4/23/2009 | 4/23/2009 3:27:43 PM | P | PASS |
|
|
|
ESC09-00052
| Tracking Control | 4/21/2009 | 4/23/2009 | 4/23/2009 11:12:38 AM | A | PASS |
|
|
|
ESC09-00102
| Conference | 4/6/2009 | 4/23/2009 | 4/23/2009 10:47:20 AM | A | CANC |
|
|
10:30am
|
ESC08-00924
| BMP Violation | 4/20/2009 | 4/23/2009 | 4/23/2009 9:53:20 AM | A | PASS |
|
|
|
ESC09-00164
| General Inspection | 4/21/2009 | 4/23/2009 | 4/23/2009 9:14:28 AM | A | PASS |
|
|
No activity
|
ESC07-00986
| Tracking Control | 4/23/2009 | 4/23/2009 | 4/23/2009 8:37:38 AM | A | FAIL |
|
|
Vebal to RP: Clean up all sediment and debris off of the Northside of area. Will re-inspect 4/24/09 AM.
|
ESC09-00007
| Site Preparation | 4/23/2009 | 4/23/2009 | 4/23/2009 8:32:54 AM | A | PART |
|
|
Verbal to Ryan Ward w/ Central Paving: Change the info of RP to the one given to the city. Clean up all debris around the storm drains on the exit of the project. Will re-inspect on 4/24/09 PM
|