Inspections for the day of: Thursday, April 23, 2009.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00087 Site Preparation4/23/20094/23/20094/24/2009 3:53:34 PMPPART
Verbal with RP:
Locaate the direction of construction traffic flow. Protect the storm drains within the area of the traffic flow. Will re-inspect on 4/28/09AM
ESC08-00491 General Inspection4/22/20094/23/20094/23/2009 4:42:02 PMPFAIL
Correction Notice:
1. Clean up all hard surfaces of all sediment and debris within the gutterpan on the perimeter of the project
ESC09-00137 Site Preparation4/23/20094/23/20094/23/2009 4:13:17 PMPFAIL
Message for RP:
1 Clean up parking lot of all sediment and debris.
2. Post ESC sign
3. Protect all stock pile of gravel and pit run.
Will re-inspect on 4/27/09.
ESC08-00354 General Inspection4/23/20094/23/20094/23/2009 3:27:43 PMPPASS
ESC09-00052 Tracking Control4/21/20094/23/20094/23/2009 11:12:38 AMAPASS
ESC09-00102 Conference4/6/20094/23/20094/23/2009 10:47:20 AMACANC
10:30am
ESC08-00924 BMP Violation4/20/20094/23/20094/23/2009 9:53:20 AMAPASS
ESC09-00164 General Inspection4/21/20094/23/20094/23/2009 9:14:28 AMAPASS
No activity
ESC07-00986 Tracking Control4/23/20094/23/20094/23/2009 8:37:38 AMAFAIL
Vebal to RP:
Clean up all sediment and debris off of the Northside of area. Will re-inspect 4/24/09 AM.
ESC09-00007 Site Preparation4/23/20094/23/20094/23/2009 8:32:54 AMAPART
Verbal to Ryan Ward w/ Central Paving:
Change the info of RP to the one given to the city.
Clean up all debris around the storm drains on the exit of the project. Will re-inspect on 4/24/09 PM