ESC10-00264
| Site Preparation | 4/23/2010 | 4/23/2010 | 4/23/2010 3:42:32 PM | P | NR |
|
|
|
BLD10-00676
| BLD-Footing | 4/23/2010 | 4/23/2010 | 4/23/2010 3:42:15 PM | P | CANC |
|
|
ryan Phone #: ###-####. Per contractor, no footing work for today.
|
BLD10-00271
| BLD-Framing/Rough-in | 4/23/2010 | 4/23/2010 | 4/23/2010 2:08:29 PM | A | PASS |
|
|
Face layer of 5/8 type x rock for2hr. firewall, both sides, 1st. floor.
|
BLD10-00270
| BLD-Framing/Rough-in | 4/23/2010 | 4/23/2010 | 4/23/2010 2:08:11 PM | A | PASS |
|
|
Face layer of 5/8 type x rock for2hr. firewall, both sides, 1st. floor.
|
BLD10-00268
| BLD-Framing/Rough-in | 4/23/2010 | 4/23/2010 | 4/23/2010 2:07:57 PM | A | PASS |
|
|
Face layer of 5/8 type x rock for2hr. firewall, both sides, 1st. floor.
|
BLD10-00633
| BLD-Footing | 4/23/2010 | 4/23/2010 | 4/23/2010 2:06:45 PM | P | PASS |
|
|
chris Phone #: ###-####
|
ESC10-00253
| Site Preparation | 4/23/2010 | 4/23/2010 | 4/23/2010 2:06:21 PM | P | PASS |
|
|
ESC permit sign posted. BMP's in place. ok.
|