FIR12-00034
| INSP-Final Inspection | 4/20/2012 | 4/23/2012 | 4/23/2012 5:24:13 PM | A | PART |
|
|
Begin 24 hr. test of the new dry system at 10:30 AM @41.5psig.
|
FIR11-00689
| INSP-Sprinkler Rough-in | 4/19/2012 | 4/23/2012 | 4/23/2012 5:20:52 PM | P | NR |
|
|
Preliminary inspection for overhead work at system 9 including partial install of 6" and 4" mains and 1 1/2" branchlines only. Upright heads, seismic bracing, tailbacks, 4" grid main, coverage at stairways and comm rooms are incomplete at this time.
|
FIR11-00659
| INSP-Final Inspection | 4/23/2012 | 4/23/2012 | 4/23/2012 5:12:33 PM | P | PASS |
|
|
|
FIR12-00179
| INSP-Final Inspection | 4/23/2012 | 4/23/2012 | 4/23/2012 5:10:19 PM | P | PASS |
|
|
Fire sprinkler work passed inspection, permit final approved.
|
FIR11-00575
| INSP-Final Inspection | 4/23/2012 | 4/23/2012 | 4/23/2012 5:09:04 PM | A | PART |
|
|
Operational test of the fire curtain and acceptance testing per NFPA 80 completed. Re-inspection passed.
|
FIR12-00166
| INSP-Final Inspection | 4/23/2012 | 4/23/2012 | 4/23/2012 4:59:45 PM | A | PASS |
|
|
Scope of fire alarm work passed inspection. Permit finaled.
|