BLD12-03138 FIRE-Final Inspection4/23/20134/23/20134/23/2013 4:56:47 PMPPASS
Fire life safety final approved.
FIR12-00108 INSP-Sprinkler Rough-in4/22/20134/23/20134/23/2013 4:55:25 PMAFAIL
Completed inspection for the remainder of work at the 3rd floor- vestibule at stair #2 now has a drop ceiling, coverge at electrical room adjacent to stair #3 is overspaced, comm room is not finished, five light fixture obstructions at the storage room. System 2 remote calc area #3 does not match field installation- pipe sizing, head type/layout, branchlines and room area are different.
FIR13-00103 INSP-Sprinkler Rough-in4/22/20134/23/20134/23/2013 4:43:56 PMAPART
Overhead work at the grid ceilings is approved for cover. Need to check coverage opposite new wall NW corner- added upright appears missing.
FIR13-00175 INSP-Sprinkler Rough-in4/23/20134/23/20134/23/2013 4:36:22 PMAPART
UG fire supply line IBR is approved for bury.
BLD13-00674 FIRE-Final Inspection4/17/20134/23/20134/23/2013 4:34:52 PMAPASS
Noted correction items have been finished. Life safety passed.
BLD13-00620 FIRE-Final Inspection4/22/20134/23/20134/23/2013 4:32:10 PMAPASS
Correction items verified for completion. Fire life safety passed.
FIR13-00139 INSP-Sprinkler Rough-in4/22/20134/23/20134/23/2013 4:28:31 PMAPART
Overhead fire sprinkler modifications are approved for cover at the drop ceilings.
FIR13-00142 INSP-Sprinkler Rough-in4/22/20134/23/20134/23/2013 4:18:37 PMAPART
Overhead rough-in completed. Cover approval pending verification of cold cavity protection when installed. Missing coverage below the upper stair landing, riser is not yet built, DP at the garage are on order.