FIR12-00080
| FIR-Aging Inspection | 4/23/2013 | 4/23/2013 | 4/25/2013 7:31:27 AM | | NR |
|
|
Waiting for steve with simplex to schedule inspections.
|
FIR12-00077
| FIR-Aging Inspection | 4/23/2013 | 4/23/2013 | 4/25/2013 7:27:26 AM | | NR |
|
|
Waiting for steve with simplex to schedule inspections.
|
FIR12-00076
| FIR-Aging Inspection | 4/23/2013 | 4/23/2013 | 4/25/2013 7:26:09 AM | | NR |
|
|
Waiting for steve with simplex to schedule inspections.
|
BLD13-00920
| FIRE-Final Inspection | 4/23/2013 | 4/23/2013 | 4/23/2013 4:03:28 PM | P | CANC |
|
|
Overbooked. Rescheduled for tomorrow morning.
|
FIR13-00135
| INSP-Sprinkler Rough-in | 4/23/2013 | 4/23/2013 | 4/23/2013 3:46:40 PM | P | PASS |
|
|
The sprinkler protection is complete in Area "1A"
|
BLD13-00021
| FIRE-Final Inspection | 4/22/2013 | 4/23/2013 | 4/23/2013 3:44:04 PM | A | PART |
|
|
Life safety is passed in Area "1A" is ok to occupy as far as Fire is concerned. Emergency lighting is actually every light in the building and not scattered as per plan.
|
FIR12-00749
| INSP-Final Inspection | 4/22/2013 | 4/23/2013 | 4/23/2013 3:15:51 PM | P | FAIL |
|
|
Inspection was actually just for a cover which is passed. Fitter was modifying the fire hydrant to meet height requirements and will need to call for a final inspection when done.
|
FIR13-00032
| INSP-Sprinkler Rough-in | 4/23/2013 | 4/23/2013 | 4/23/2013 2:23:13 PM | P | CANC |
|
|
per javier the as-builts are not ready. Re-scheduled for tomorrow morning.
|
BLD12-02195
| FIRE-Final Inspection | 4/22/2013 | 4/23/2013 | 4/23/2013 2:02:31 PM | A | PART |
|
|
A temporary occupancy is being given with Romeo's permission until the audible alarms are installed for the remote duct detector annunciators.
|
BLD13-00933
| FIRE-Final Inspection | 4/22/2013 | 4/23/2013 | 4/23/2013 1:34:47 PM | A | FAIL |
|
|
Provide racking/high pile storage permit for the racking that exceeds 8', repair all of the emergency lights, resubmit floor plan for new walls that are being built.
|
FIR13-00160
| INSP-Final Inspection | 4/23/2013 | 4/23/2013 | 4/23/2013 1:31:07 PM | P | PASS |
|
|
permit finaled
|
FIR13-00160
| INSP-Final Inspection | 4/22/2013 | 4/23/2013 | 4/23/2013 11:42:10 AM | A | PASS |
|
|
Permit finaled
|
BLD12-01698
| FIRE-Conference | 4/23/2013 | 4/23/2013 | 4/23/2013 10:28:35 AM | P | DONE |
|
|
Darrin, myself and a gentleman from Enterprise Electric dicussed and agreed that emergency lighting, below the mezzanine would be modified from what has been installed. We agreed that three lights would be installed in each of the three long corridors and one light would be installed in the short corridors. This was decided after readings from a light meter.
|
BLD13-00725
| FIRE-Final Inspection | 4/22/2013 | 4/23/2013 | 4/23/2013 10:19:19 AM | A | PASS |
|
|
life safety passed
|
FIR12-00670
| INSP-Sprinkler Rough-in | 4/22/2013 | 4/23/2013 | 4/23/2013 10:10:05 AM | A | PASS |
|
|
See the city approved plans for locations where ceiling tile can be installed to cover piping
|
FIR13-00153
| INSP-Final Inspection | 4/17/2013 | 4/23/2013 | 4/23/2013 8:16:44 AM | A | PASS |
|
|
Permit finaled. Netcon was a 5
|
FIR12-00582
| INSP-Supply line flush | 4/22/2013 | 4/23/2013 | 4/23/2013 7:52:20 AM | A | PASS |
|
|
Underground flush passed on second residence from the north end.
|