MEC14-01357
| Pressure Test | 4/22/2014 | 4/23/2014 | 4/23/2014 4:44:44 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Randy Hart
|
MEC14-01005
| Final | 4/23/2014 | 4/23/2014 | 4/23/2014 4:19:32 PM | P | PASS |
|
|
randy ###-####
|
MEC13-01276
| Final | 4/23/2014 | 4/23/2014 | 4/23/2014 3:45:25 PM | P | PASS |
|
|
mike
|
MEC13-05228
| Final | 4/23/2014 | 4/23/2014 | 4/23/2014 3:30:29 PM | P | FAIL |
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino..NO MANUAL J OR AIR BALANCE ON SITE..WHERE IS SHUT-OFF FOR F/P?...ACCESS TO FURNACE AND WHERE ARE CONDENSATE LOCATIONS?
|
MEC14-01547
| Rough-in | 4/23/2014 | 4/23/2014 | 4/23/2014 3:08:59 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Brad Allison
|
MEC14-00696
| Final | 4/23/2014 | 4/23/2014 | 4/23/2014 2:33:57 PM | P | PASS |
|
|
Please call Jon 30 minutes prior for access, ###-####. Phone #: ###-#### >> Inspection requested via web by April Thomas
|
MEC14-01284
| Final | 4/23/2014 | 4/23/2014 | 4/23/2014 2:14:33 PM | P | PASS |
|
|
Reinspect Final Phone #: ###-#### >> Inspection requested via web by Konrad Swartz
|
MEC14-01201
| Final | 4/23/2014 | 4/23/2014 | 4/23/2014 2:10:15 PM | P | PASS |
|
|
Reinspect Final Phone #: ###-#### >> Inspection requested via web by Konrad Swartz
|
MEC14-01500
| Final | 4/21/2014 | 4/23/2014 | 4/23/2014 1:51:21 PM | P | FAIL |
|
|
Mr. Phillip Iriondo requests an afternoon inspection. Phone #: ###-#### >> Inspection requested via web by Marnie Aldrich...NEED A CARBON MONOXIDE DETECTOR AT EACH BEDROOM (2)...HOME OWNER IS PHIL AT ###-####.
|
MEC14-01005
| Final | 4/22/2014 | 4/23/2014 | 4/23/2014 11:53:24 AM | A | PEND |
|
|
Phone #: ###-#### >> Inspection requested via web by Randy Hart..rescheduled for pm
|
MEC12-03650
| Pressure Test | 4/22/2014 | 4/23/2014 | 4/23/2014 10:30:55 AM | A | PASS |
|
|
if questions call Matt @ ###-####. Phone #: ###-#### >> Inspection requested via web by Stacia Haumann..all hydronics on north side of space ok at 100lb test
|
MEC14-01034
| Final | 4/22/2014 | 4/23/2014 | 4/23/2014 9:32:33 AM | A | NR |
|
|
please call john with notification and/or questions Phone #: ###-#### >> Inspection requested via web by Nicholas Paige..need to verify if it's a fire damper or smoke fire damper and will need access to see it...will need resubmittal from engineering noting any changes different from the drawing. need manuf specs for damper on site at time of final
|
MEC13-01276
| Rough-in | 4/21/2014 | 4/23/2014 | 4/23/2014 9:29:36 AM | A | PASS |
|
|
8:30 mike ###-####
|
MEC14-01547
| Final | 4/22/2014 | 4/23/2014 | 4/23/2014 9:07:14 AM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Brad Allison Inspection cancelled from web by: Brad Allison
|
GCM14-00082
| GCM-Final | 4/18/2014 | 4/23/2014 | 4/23/2014 8:35:00 AM | A | PASS |
|
|
8:30 meet contractor for flue test
|
MEC14-01547
| Conference | 4/22/2014 | 4/23/2014 | 4/22/2014 2:01:08 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Brad Allison Inspection cancelled from web by: Brad Allison
|