Inspections for the day of: Thursday, April 23, 2015.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00771 INSP-Sprinkler Rough-in4/23/20154/23/20154/23/2015 3:26:07 PMPCANC
Underground supply was not ready for inspection
FIR15-00241 INSP-Sprinkler Rough-in4/23/20154/23/20154/23/2015 3:05:43 PMPPASS
Underground supply piping is ok to cover.
BLD15-01220 FIRE-Final Inspection4/22/20154/23/20154/23/2015 2:36:28 PMPPASS
Life safety passed
FIR15-00243 INSP-Final Inspection4/22/20154/23/20154/23/2015 2:35:38 PMPPASS
Permit finaled. Hood suppression system functioned correctly. I noted that the exit from the tenant space is not compliant with fire dept agreement and will need to be corrected prior to a building sign off.
FIR14-00753 INSP-Sprinkler Rough-in4/23/20154/23/20154/23/2015 2:03:40 PMPPASS
Underground supply piping is ok to cover
FIR14-00752 INSP-Sprinkler Rough-in4/23/20154/23/20154/23/2015 2:03:30 PMPPASS
Underground supply is ok to cover
FIR14-00768 INSP-Sprinkler Rough-in4/23/20154/23/20154/23/2015 1:07:34 PMPPASS
Underground supply line ok to bury.
FIR13-00295 INSP-Final Inspection4/22/20154/23/20154/23/2015 12:20:24 PMAPASS
permit finaled
NAF14-00020 INSP-Final4/22/20154/23/20154/23/2015 12:19:33 PMAPASS
permit finaled by Ron with boise fire
FIR14-00920 INSP-Final Inspection4/21/20154/23/20154/22/2015 7:00:19 AMAFAIL
Inspection actually performed on 4/21/2015 but not scheduled. Missing document box and it appears an additional monitor module is needed to monitor the new NAC panel. Also only one surge protector was installed at the FACP instead of the two as shown on the plans. As-builts needed showing these changes prior to a final sign off.