FIR14-00771
| INSP-Sprinkler Rough-in | 4/23/2015 | 4/23/2015 | 4/23/2015 3:26:07 PM | P | CANC |
|
|
Underground supply was not ready for inspection
|
FIR15-00241
| INSP-Sprinkler Rough-in | 4/23/2015 | 4/23/2015 | 4/23/2015 3:05:43 PM | P | PASS |
|
|
Underground supply piping is ok to cover.
|
BLD15-01220
| FIRE-Final Inspection | 4/22/2015 | 4/23/2015 | 4/23/2015 2:36:28 PM | P | PASS |
|
|
Life safety passed
|
FIR15-00243
| INSP-Final Inspection | 4/22/2015 | 4/23/2015 | 4/23/2015 2:35:38 PM | P | PASS |
|
|
Permit finaled. Hood suppression system functioned correctly. I noted that the exit from the tenant space is not compliant with fire dept agreement and will need to be corrected prior to a building sign off.
|
FIR14-00753
| INSP-Sprinkler Rough-in | 4/23/2015 | 4/23/2015 | 4/23/2015 2:03:40 PM | P | PASS |
|
|
Underground supply piping is ok to cover
|
FIR14-00752
| INSP-Sprinkler Rough-in | 4/23/2015 | 4/23/2015 | 4/23/2015 2:03:30 PM | P | PASS |
|
|
Underground supply is ok to cover
|
FIR14-00768
| INSP-Sprinkler Rough-in | 4/23/2015 | 4/23/2015 | 4/23/2015 1:07:34 PM | P | PASS |
|
|
Underground supply line ok to bury.
|
FIR13-00295
| INSP-Final Inspection | 4/22/2015 | 4/23/2015 | 4/23/2015 12:20:24 PM | A | PASS |
|
|
permit finaled
|
NAF14-00020
| INSP-Final | 4/22/2015 | 4/23/2015 | 4/23/2015 12:19:33 PM | A | PASS |
|
|
permit finaled by Ron with boise fire
|
FIR14-00920
| INSP-Final Inspection | 4/21/2015 | 4/23/2015 | 4/22/2015 7:00:19 AM | A | FAIL |
|
|
Inspection actually performed on 4/21/2015 but not scheduled. Missing document box and it appears an additional monitor module is needed to monitor the new NAC panel. Also only one surge protector was installed at the FACP instead of the two as shown on the plans. As-builts needed showing these changes prior to a final sign off.
|