ESC14-01011
| General Inspection | 4/23/2015 | 4/23/2015 | 4/24/2015 8:07:20 AM | | PASS |
|
|
No activity. New SFH in foothills has not started. Site prep inspection required prior to foundation excavation.
|
ESC14-00944
| General Inspection | 4/23/2015 | 4/23/2015 | 4/23/2015 4:21:29 PM | | PASS |
|
|
Frame complete. WIP on interior. No sediment leaving site. Trash contained and no discharges occuring. Approved.
|
ESC14-00865
| General Inspection | 4/23/2015 | 4/23/2015 | 4/23/2015 3:55:12 PM | | CANC |
|
|
rescheduled
|
ESC14-01014
| Aging Inspection | 4/23/2015 | 4/23/2015 | 4/23/2015 3:49:03 PM | | PASS |
|
|
Near completion. Finishing touches and landscaping being completed. Permits posted. No corrections at this time.
|
ESC14-01023
| Random Inspection | 4/23/2015 | 4/23/2015 | 4/23/2015 3:44:00 PM | P | PEND |
|
|
Silt fence BMP was removed to complete some grading acitivity.
Checked with homeowner/ESC contact to check on status of steep disturbed banks on west house and behind home. She informed me that tomorrow a large boulder retaining wall is being installed in area of concern. Then next week the area shall be hydroseeded to start process of landscaping.
Requested that if hydroseeding/stabilization is delayed that the silt fence or alternative sediment control BMP be installed at toe of slope and EoP.
|
ESC14-00751
| General Inspection | 4/23/2015 | 4/23/2015 | 4/23/2015 3:30:10 PM | | PASS |
|
|
WIP on Fire Station #1 site improvement project. No trackout. Onsite stormdrains have sediment protection. Approved.
|
ESC14-00943
| General Inspection | 4/23/2015 | 4/23/2015 | 4/23/2015 2:51:52 PM | | PASS |
|
|
WIP. Culdesac is free of trackout, spills, trash, or other pollutants. Area of disturbance on parcel is surrrounded by pre-exisiting vegetation that was preserved. No sediment leaving site. No hillside erosion rills or gullies developing.
|
ESC14-00898
| Aging Inspection | 4/23/2015 | 4/23/2015 | 4/23/2015 2:48:18 PM | | PASS |
|
|
Home complete, landscaped, and occupied. ESC permit conditions satisfied.
|
ESC14-00898
| DOC - Permit Finaled | 4/23/2015 | 4/23/2015 | 4/23/2015 2:47:48 PM | P | PASS |
|
|
|
ESC15-00035
| General Inspection | 4/23/2015 | 4/23/2015 | 4/23/2015 2:45:36 PM | P | PART |
|
|
Site walk through. No sediment runoff areas around perimeter, some minor trackout at east exit.
Fugitive dust not an issue at time of inspection. Water truck on site if necessary.
Observed uncontained concrete washout area south of fire station. RP Jon stated a container should be being utilized instead. I did not see the container at that time.
Correction notice: 1. Clean up concrete slurry. 2. Clearly identify and train concrete workers to washout in designated contained washout (as prescribed in the site's SWPPP)
|
ESC14-00094
| General Inspection | 4/23/2015 | 4/23/2015 | 4/23/2015 1:58:04 PM | | PASS |
|
|
Pavillion on the duck pond is constructed. The staging area and new grass plantings are stabilizing/establishing. No activity at time of inspection. No violations or discharges. Will keep open to continue to monitor.
|
ESC14-00725
| General Inspection | 4/23/2015 | 4/23/2015 | 4/23/2015 1:23:48 PM | | PASS |
|
|
WIP on interior. Downslope gator guard protecting canal right-of-way area is installed properly. No correcitons needed at this time.
|