ELE18-01451
| Electrical Rough-In | 4/23/2018 | 4/23/2018 | 4/24/2018 9:10:39 AM | P | PASS |
|
|
Ron-pool bonding Phone #: ###-####...4 corners, cover, and 4 lights
|
ELE18-01154
| Conference | 4/23/2018 | 4/23/2018 | 4/23/2018 3:40:42 PM | P | PASS |
|
|
Tom Phone #: ###-####...adding outlets off existing circuit in shed...pamphlet given...homeowner very capable to do work
|
ELE18-01528
| Rough-In Permanent Service | 4/23/2018 | 4/23/2018 | 4/23/2018 2:39:00 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by ron spen cer...rough ok to cover...p/s u/g new ok
|
ELE18-01528
| Rough-In Permanent Service | 4/23/2018 | 4/23/2018 | 4/23/2018 2:38:21 PM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by ron spen cer...scheduled twice
|
ELE18-01522
| Electrical Rough-In | 4/22/2018 | 4/23/2018 | 4/23/2018 1:46:35 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Andy Derrick...3 new circuits for new upstairs entertainment room and can lighting downstairs of existing circuit...rough ok to cover
|
ELE18-01290
| Electrical Rough-In | 4/23/2018 | 4/23/2018 | 4/23/2018 1:27:07 PM | P | PASS |
|
|
Brian Prussia Phone #: ###-####...UL listed equipment verified
|
ELE18-01495
| Final | 4/22/2018 | 4/23/2018 | 4/23/2018 12:10:52 PM | P | PASS |
|
|
panel change final Phone #: ###-#### Inspection requested via web by kyle carson..ok to final
|
ELE18-00973
| Final | 4/22/2018 | 4/23/2018 | 4/23/2018 10:03:49 AM | A | PASS |
|
|
All panels complete side garage man door should be open! Any questions please give me a call! Thx. Steve, BPL Phone #: ###-#### Inspection requested via web by Steven Meredith...ok to final
|
ELE18-01456
| Final | 4/20/2018 | 4/23/2018 | 4/23/2018 9:15:19 AM | A | FAIL |
|
|
Steve Hook is contact ###-#### Phone #: ###-#### Inspection requested via web by Debby Pierce... 1..flexible cords and cables shall be protected from accidental damage...590.4(H) 2..all temporary installations shall have GFCI protection...240V breakers...590.6
|
ELE18-01525
| Final | 4/22/2018 | 4/23/2018 | 4/23/2018 8:46:59 AM | A | CANC |
|
|
Manufactured home new hook up from existing pedestal. Phone #: ###-#### Inspection requested via web by kyle carson...unable to final at this time...need to schedule once power connected
|
ELE18-01525
| Permanent Service | 4/23/2018 | 4/23/2018 | 4/23/2018 8:46:13 AM | A | PASS |
|
|
Manufactured home new hook up from existing pedestal. Phone #: ###-#### Inspection requested via web by kyle carson...p/s u/g new ok
|
ELE13-00731
| ELE-Aging Inspection | 4/23/2018 | 4/23/2018 | 4/23/2018 8:40:15 AM | | DONE |
|
|
owner not compliant with needed correction
|