MEC18-01758
| Final | 4/23/2018 | 4/23/2018 | 4/23/2018 4:10:47 PM | P | PASS |
|
|
Please call Deborah Faris about 30 - 60 minutes prior to inspection. ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
MEC18-00735
| Final | 4/20/2018 | 4/23/2018 | 4/23/2018 3:39:37 PM | P | PASS |
|
|
AC:1905 Phone #: ###-#### Inspection requested via web by Gary Reeves
|
MEC17-05533
| Final | 4/20/2018 | 4/23/2018 | 4/23/2018 3:29:37 PM | P | FAIL |
|
|
AC:7354 Phone #: ###-#### Inspection requested via web by Gary Reeves - No air balance reports on site, need duct blast on upstairs furnace, Need to complete combustion air piping for down stairs furnace, need combustion air for upstairs furnace and water heater
|
MEC18-01006
| Rough-in | 4/20/2018 | 4/23/2018 | 4/23/2018 3:28:41 PM | P | NR |
|
|
Request for duct cover inspection. Phone #: ###-#### Inspection requested via web by Melissa Kaae
|
MEC18-01697
| Final | 4/23/2018 | 4/23/2018 | 4/23/2018 3:02:10 PM | P | PASS |
|
|
Please call Jared Ostyn! Phone #: ###-#### Inspection requested via web by Baldomero Guzman
|
MEC18-00272
| Rough-in | 4/23/2018 | 4/23/2018 | 4/23/2018 2:34:03 PM | P | PASS |
|
|
Rough in Inspection ; Antonio is your contact. Thank you! Phone #: ###-#### Inspection requested via web by Kim Adams - duct work in pharmacy okay
|
MEC18-01786
| Final | 4/20/2018 | 4/23/2018 | 4/23/2018 2:10:09 PM | P | PASS |
|
|
PLEASE CALL INSTALLER: JESSE ###-#### THANK YOU Phone #: ###-#### Inspection requested via web by Aaron Alandt
|
MEC18-01796
| Pressure Test | 4/22/2018 | 4/23/2018 | 4/23/2018 1:39:39 PM | P | PASS |
|
|
Early afternoon if possible, please. Call Owner Kyle at ###-#### with a 30 minute heads up arrival time. Phone #: ###-#### Inspection requested via web by David or K Cole - 20lb gas pass
|
MEC17-02565
| Mec-Aging Inspection | 4/23/2018 | 4/23/2018 | 4/23/2018 12:07:54 PM | | CANC |
|
|
|
MEC18-01778
| Rough-in | 4/20/2018 | 4/23/2018 | 4/23/2018 10:17:24 AM | A | PASS |
|
|
rough in / cover Phone #: ###-#### Inspection requested via web by Brandon Sorensen - Okay to cover hard lids
|
MEC18-00984
| Conference | 4/20/2018 | 4/23/2018 | 4/23/2018 9:37:53 AM | A | DONE |
|
|
9:30am Phone #: ###-#### Inspection requested via web by Randy Hart - Duct blast pass. air balance report is on site. still need water heater installed so vent can be connected to be able to final permit out.
|
MEC18-01603
| Rough-in | 4/17/2018 | 4/23/2018 | 4/23/2018 9:11:17 AM | A | PASS |
|
|
ROUGH-IN FOR NEW A/C ; RE-USE EXISTING FURNACE Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING
|
MEC18-01598
| Final | 4/20/2018 | 4/23/2018 | 4/23/2018 8:47:01 AM | A | PASS |
|
|
Inspection requested via web by Andrea Grigsby
|
MEC18-01373
| Pressure Test | 4/20/2018 | 4/23/2018 | 4/23/2018 8:19:05 AM | A | PART |
|
|
Pressure test to underground gas line - Call Jason with any issues @ 412.6696 Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek - 60lb gas pass on piping from meter to west mech. rm. 20lb gas pass for piping in the overhead. 20lb gas fail for piping under floor, gauge was down to 16lbs
|