BLD17-04455
| FIRE-Final Inspection | 4/23/2018 | 4/23/2018 | 4/23/2018 12:56:56 PM | P | PASS |
|
|
Final life fire safety inspection for scope of work complete.
|
FIR18-00171
| INSP-Sprinkler Rough-in | 4/20/2018 | 4/23/2018 | 4/23/2018 12:35:00 PM | A | PART |
|
|
24 hr air test started at 1230PM @ 40PSI
|
FIR18-00173
| INSP-Sprinkler Rough-in | 4/20/2018 | 4/23/2018 | 4/23/2018 12:34:10 PM | A | PART |
|
|
24 hr air test started at 1230PM @ 40PSI
|
FIR18-00088
| INSP-Final Inspection | 4/23/2018 | 4/23/2018 | 4/23/2018 12:33:09 PM | P | PASS |
|
|
Final inspection for underground supply complete.
|
FIR18-00088
| INSP-Sprinkler Rough-in/Hydro | 4/23/2018 | 4/23/2018 | 4/23/2018 12:32:38 PM | P | DONE |
|
|
Undergorund hydrostatic test witnessed, no pressure loss observed at riser provided gauge.
|
FIR18-00088
| INSP-Supply line flush | 4/23/2018 | 4/23/2018 | 4/23/2018 12:27:20 PM | P | DONE |
|
|
Underground flush complete.
|
FIR16-00586
| INSP-Final Inspection | 4/18/2018 | 4/23/2018 | 4/23/2018 11:15:06 AM | A | PART |
|
|
Fire sprinkler heads/escutcheons on levels 5, 3, and 2 are complete, still need to test flow switches/tampers on all floors.
|
FIR16-00586
| INSP-Sprinkler Rough-in/Hydro | 4/23/2018 | 4/23/2018 | 4/23/2018 11:13:44 AM | A | FAIL |
|
|
Hydrostatic test for level 4 will need to be completed after repairs are made. Relocate heads that are blocked by drain piping on level 1 dry system.
|
FIR17-00232
| INSP-Final Inspection | 4/23/2018 | 4/23/2018 | 4/23/2018 11:11:20 AM | P | FAIL |
|
|
Provide map at main final panel showing devices for all buildings. Provide document cabinet at main fire panel. Troubleshoot issue for audio visual notification, no A/V's operated when flow switch was activated. FDC bell did not ring on water flow with dry system.
|