Inspections for the day of: Monday, April 23, 2018.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD17-04455 FIRE-Final Inspection4/23/20184/23/20184/23/2018 12:56:56 PMPPASS
Final life fire safety inspection for scope of work complete.
FIR18-00171 INSP-Sprinkler Rough-in4/20/20184/23/20184/23/2018 12:35:00 PMAPART
24 hr air test started at 1230PM @ 40PSI
FIR18-00173 INSP-Sprinkler Rough-in4/20/20184/23/20184/23/2018 12:34:10 PMAPART
24 hr air test started at 1230PM @ 40PSI
FIR18-00088 INSP-Final Inspection4/23/20184/23/20184/23/2018 12:33:09 PMPPASS
Final inspection for underground supply complete.
FIR18-00088 INSP-Sprinkler Rough-in/Hydro4/23/20184/23/20184/23/2018 12:32:38 PMPDONE
Undergorund hydrostatic test witnessed, no pressure loss observed at riser provided gauge.
FIR18-00088 INSP-Supply line flush4/23/20184/23/20184/23/2018 12:27:20 PMPDONE
Underground flush complete.
FIR16-00586 INSP-Final Inspection4/18/20184/23/20184/23/2018 11:15:06 AMAPART
Fire sprinkler heads/escutcheons on levels 5, 3, and 2 are complete, still need to test flow switches/tampers on all floors.
FIR16-00586 INSP-Sprinkler Rough-in/Hydro4/23/20184/23/20184/23/2018 11:13:44 AMAFAIL
Hydrostatic test for level 4 will need to be completed after repairs are made. Relocate heads that are blocked by drain piping on level 1 dry system.
FIR17-00232 INSP-Final Inspection4/23/20184/23/20184/23/2018 11:11:20 AMPFAIL
Provide map at main final panel showing devices for all buildings. Provide document cabinet at main fire panel. Troubleshoot issue for audio visual notification, no A/V's operated when flow switch was activated. FDC bell did not ring on water flow with dry system.