ELE18-01391
| Final | 4/22/2019 | 4/23/2019 | 4/23/2019 1:22:08 PM | P | PART |
|
|
Finalize levels 1 and 2. Phone #: ###-#### Inspection requested via web by Tom Betty Area requested not accurate. Level 2 corrections made. Level 4 Circuits 4NLF 24,26 damaged. Room 268 Receps within 6ft of sink need GFCI protection. Level 5 lobby ready for final. Rooftop patio and Heat trace ok. Note: Items needed for final are, Level 1 kitchen, Level 2 Procedure lights, Level 3 procedure lights,Level 4 Circuits 4NLF 24,26 repair, Rm 268 GFCI protection, Procedure lights.
|
ELE18-03873
| Electrical Rough-In | 4/23/2019 | 4/23/2019 | 4/23/2019 12:23:49 PM | P | PASS |
|
|
Jose Phone #: ###-#### ceiling only ok to cover
|
ELE19-01348
| Rough-In Permanent Service | 4/23/2019 | 4/23/2019 | 4/23/2019 11:42:00 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson rough in ok p/s u/g n ok
|
ELE19-01347
| Rough-In Permanent Service | 4/23/2019 | 4/23/2019 | 4/23/2019 11:16:42 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson rough in ok to cover. p/s u/g n ok
|
ELE19-01416
| Electrical Rough-In | 4/22/2019 | 4/23/2019 | 4/23/2019 11:10:11 AM | A | PASS |
|
|
key is on right side of door under small rock next to wall Phone #: ###-#### Inspection requested via web by kevin blackmon Above panel and 2 front offices. Walls only ok to cover
|
ELE19-00939
| Final | 4/22/2019 | 4/23/2019 | 4/23/2019 10:12:25 AM | A | NH |
|
|
homeowners will be there in the AM Phone #: ###-#### Inspection requested via web by A.M.E. Office No access recall
|
ELE19-00486
| Final | 4/19/2019 | 4/23/2019 | 4/23/2019 10:02:18 AM | A | PASS |
|
|
Garage code 1957e Phone #: ###-#### Inspection requested via web by Alan Lusk Final ok
|
ELE19-01435
| Electrical Rough-In | 4/22/2019 | 4/23/2019 | 4/23/2019 9:38:14 AM | A | PASS |
|
|
listing inspection for solar equipment. Its a 5 panel solar addition to an existing array. An installer will be on site to show panels and optimizers being used. Give me a call on your way out. The installer will be done with work, and just waiting, so the earlier the better! Thanks guys Phone #: ###-#### Inspection requested via web by Ryan King listing only ok
|
ELE19-01301
| Electrical Rough-In | 4/22/2019 | 4/23/2019 | 4/23/2019 9:02:49 AM | A | PASS |
|
|
Brian Prussia is contact. Building and Electrical rough inspection scheduled for the same time. Phone #: ###-#### Inspection requested via web by BRS Permitting Listing only ok Panel and disc. in back yard checked at rough in.
|
ELE19-00635
| Electrical Rough-In | 4/22/2019 | 4/23/2019 | 4/23/2019 8:47:39 AM | A | PASS |
|
|
We need a grid inspection. Tobias is the site contact, thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Correction made ceiling ok to cover
|