Inspections for the day of: Tuesday, April 23, 2019.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00692 General Inspection4/22/20194/23/20194/26/2019 3:37:20 PMPPASS
Work area is clean. No slrurry in gutter. Gutter beyond work area has been swept. No corrections.
ESC18-00784 General Inspection4/23/20194/23/20194/26/2019 3:06:27 PM PASS
No trackout. Perimeter controls, track pad, and inlet protection are installed. RP on duty.
ESC18-00785 Site Final4/23/20194/23/20194/26/2019 2:47:06 PMPPASS
Home complete and landscaped. Subdivsion BMPs to remain installed for ongoing construction. ESC permit finaled.
ESC16-01457 General Inspection4/23/20194/23/20194/23/2019 1:18:29 PM PART
DI bag in storm drain was maintained as requested. No new erosion or activity at site.

Still need to address runoff and the driveway surface material that is carried offsite during heavy rains.
ESC18-00785 General Inspection4/23/20194/23/20194/23/2019 10:01:25 AM CANC
rescheduled for site final
ESC19-00144 BMP Violation4/22/20194/23/20194/23/2019 8:14:27 AMACANC