ELE96-02184
| INSP - Temporary occupancy | 4/25/1997 | 4/24/1997 | 4/25/1997 12:00:00 AM | | PASS |
|
|
/ / 403 - NOT READY FOR FINAL, NEED SOME FIXTURES NSTALLED...MB
|
ELE96-02184
| INSP - Temporary occupancy | 4/25/1997 | 4/24/1997 | 4/25/1997 12:00:00 AM | | PASS |
|
|
/ / 403 - NOT READY FOR FINAL, NEED SOME FIXTURES NSTALLED...MB
|
ELE96-02184
| INSP - Final | 4/23/1997 | 4/24/1997 | 4/25/1997 12:00:00 AM | P | CANC |
|
|
04/24/97 403 - PHASE 3 WAITING ON SOME FIXTURES TO INSTALL...MB
|
ELE97-01276
| INSP - Electrical Rough-In | 4/24/1997 | 4/24/1997 | 4/25/1997 12:00:00 AM | P | PASS |
|
|
04/24/97 403 - partial rough-in
|
ELE97-01286
| INSP - T/S and Final | 4/24/1997 | 4/24/1997 | 4/25/1997 12:00:00 AM | P | FAIL |
|
|
04/24/97 403 - NEC: 250-83. SERVICE SHALL BE CONNECTED TO GROUNDING ELE
|
ELE97-01273
| INSP - Electrical Rough-In | 4/23/1997 | 4/24/1997 | 4/24/1997 12:00:00 AM | A | PASS |
|
|
04/23/97 403 - FOR ACCESS PAGE BOB ###-####
|
ELE97-01274
| INSP - Electrical Rough-In | 4/23/1997 | 4/24/1997 | 4/24/1997 12:00:00 AM | A | PASS |
|
|
04/23/97 403 - WIRING GARAGE AND STORAGE
|
ELE96-03699
| INSP - Final | 4/23/1997 | 4/24/1997 | 4/24/1997 12:00:00 AM | A | FAIL |
|
|
04/23/97 403 - NEC: 680-41(A)(3). G.F.C.I. PROTECTION REQUIRED FOR JETT 210-8(A)(2). G.F.C.I. PROTECTION REQUIRED IN GARAGE RECEPTICLES. B.C.E. RECEPTICLES SHALL HAVE CORRECT POLARITY...MB
|
ELE97-00718
| INSP - Permanent service | 4/23/1997 | 4/24/1997 | 4/24/1997 12:00:00 AM | A | PASS |
|
|
04/23/97 403 -
|
ELE97-00914
| INSP - Final | 4/24/1997 | 4/24/1997 | 4/24/1997 12:00:00 AM | P | PASS |
|
|
|
ELE97-01232
| INSP - Electrical Rough-In | 4/22/1997 | 4/24/1997 | 4/24/1997 12:00:00 AM | P | PASS |
|
|
04/22/97 403 - circut to undercounter water heater. 7th floor ###-####
|
ELE97-01045
| INSP - Final | 4/22/1997 | 4/24/1997 | 4/23/1997 12:00:00 AM | P | PASS |
|
|
04/23/97 403 - Please do this am 1st thing - sign-off card on top of fil S.
|