PLM00-00539
| Final | 4/24/2000 | 4/24/2000 | 4/24/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM00-01217
| Sprinkler (Final) | 4/24/2000 | 4/24/2000 | 4/24/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM00-01218
| Water and/or Sewer | 4/24/2000 | 4/24/2000 | 4/24/2000 12:00:00 AM | P | PASS |
|
|
Paige ###-####
|
PLM00-01226
| Sprinkler (Final) | 4/24/2000 | 4/24/2000 | 4/24/2000 12:00:00 AM | P | PASS |
|
|
ryan ###-#### this inspection is for the lines up to the backflow you talked to him this morning.
|
PLM00-01225
| Groundwork | 4/24/2000 | 4/24/2000 | 4/24/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/24/2000 at 10:48:06. Contact: ###-####.
|
PLM00-01169
| Plumbing Rough-in | 4/24/2000 | 4/24/2000 | 4/24/2000 12:00:00 AM | P | FAIL |
|
|
Added by Inspector: 330 On 4/24/00 waste test failed, secure tub valve, pipe t&p drain to exterior
|