PLM01-01234
| Sprinkler (Final) | 4/23/2001 | 4/24/2001 | 4/24/2001 12:00:00 AM | A | PASS |
|
|
|
PLM01-01239
| Water and/or Sewer | 4/23/2001 | 4/24/2001 | 4/24/2001 12:00:00 AM | A | PASS |
|
|
Scott ###-####
|
PLM01-00823
| Final | 4/24/2001 | 4/24/2001 | 4/24/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 352 On 4/24/2001 8:38:05 AM
|
PLM01-01247
| Storm Drains | 4/24/2001 | 4/24/2001 | 4/24/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 352 On 4/24/2001 8:44:25 AM ###-#### 4/24/2001 8:44:55 AM 4/24/2001 12:30:26 PM 4/24/2001 12:33:48 PMok on both sides of building north side tested earler 4/24/2001 1:35:20 PM
|
PLM01-01253
| Sprinkler (Final) | 4/24/2001 | 4/24/2001 | 4/24/2001 12:00:00 AM | P | PART |
|
|
Eric ###-#### underground ok cert. device plugs required in test ports 6" of clerance 6" of gravel under double check required call for reinspect 4/24/2001 2:25:29 PM
|
PLM01-01235
| Water and/or Sewer | 4/24/2001 | 4/24/2001 | 4/24/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/24/2001 at 10:02:11. Contact: ###-####.sewer only ok 4/24/2001 1:00:08 PM
|
PLM01-01235
| Groundwork | 4/24/2001 | 4/24/2001 | 4/24/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/24/2001 at 10:02:43. Contact: ###-####.will test one bath group 4/24/2001 1:01:07 PM seperate at later date 4/24/2001 1:01:33 PM 4/24/2001 1:02:26 PM
|
PLM01-00502
| Final | 4/24/2001 | 4/24/2001 | 4/24/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/24/2001 at 10:33:43. Contact: ###-####.temp occ no paper work on sight to sign left tag move thermal exp to other side of check valve remove ball valve or install drain valve above ball valve to relieve pressure on tank 4/24/2001 12:37:51 PM
|
PLM01-01255
| Plumbing Rough-in | 4/24/2001 | 4/24/2001 | 4/24/2001 12:00:00 AM | P | PASS |
|
|
ed ###-#### late pm if possible
|
PLM01-00874
| Final | 4/24/2001 | 4/24/2001 | 4/24/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/24/2001 at 08:01:13. Contact: ###-####.
|
PLM01-01247
| Plumbing Rough-in | 4/24/2001 | 4/24/2001 | 4/24/2001 12:00:00 AM | P | CANC |
|
|
###-#### wrong type inspect added 4/24/2001 8:46:15 AM
|