Inspections for the day of: Tuesday, April 24, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00222 BLD-Final4/23/20014/24/20014/24/2001 12:00:00 AMAPASS
rocky ###-#### office ###-#### cell
MEC01-01169 Final4/23/20014/24/20014/24/2001 12:00:00 AMAPASS
a/c furnace only ###-#### Bill
BLD00-03536 BLD-Final4/23/20014/24/20014/24/2001 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 04/23/2001 at 09:30:18. Contact: ###-####.
BLD00-03533 BLD-Final4/23/20014/24/20014/24/2001 12:00:00 AMPPASS
fn occ dave miller ###-#### ok for perma nant occupancy 4/24/2001 3:18:25 PM 4/24/2001 3:19:02 PM
BLD01-00656 BLD-Conference4/23/20014/24/20014/24/2001 12:00:00 AMPPASS
Brian ###-#### ok to roof and cover ext walls 4/24/2001 12:31:01 PM
BLD00-01183 BLD-Final4/23/20014/24/20014/24/2001 12:00:00 AMPPASS
cesar ###-#### to replace with stucco siding w/ 13 squares
BLD01-00351 BLD-Final4/24/20014/24/20014/24/2001 12:00:00 AMPFAIL
###-#### c/n on site 4/24/2001 2:53:55 PM
BLD01-00354 BLD-Final4/24/20014/24/20014/24/2001 12:00:00 AMPFAIL
###-####c/n on site 4/24/2001 2:54:37 PM
BLD01-00353 BLD-Final4/24/20014/24/20014/24/2001 12:00:00 AMPFAIL
###-#### c/n on site 4/24/2001 2:54:21 PM
BLD01-00352 BLD-Final4/24/20014/24/20014/24/2001 12:00:00 AMPFAIL
###-#### c/n on site 4/24/2001 2:54:08 PM
BLD00-03536 BLD-Final4/24/20014/24/20014/24/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/24/2001 at 09:21:45. Contact: ###-####.