MEC02-00993
| Rough-in | 4/23/2002 | 4/24/2002 | 4/24/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/23/2002 at 12:03:46. Contact: ###-####.
|
MEC02-00992
| Rough-in | 4/23/2002 | 4/24/2002 | 4/24/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/23/2002 at 12:04:46. Contact: ###-####.
|
MEC02-00988
| Rough-in | 4/23/2002 | 4/24/2002 | 4/24/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/23/2002 at 13:17:07. Contact: ###-####.
|
BLD01-03183
| BLD-Final | 4/23/2002 | 4/24/2002 | 4/24/2002 12:00:00 AM | A | CANC |
|
|
###-#### chris call 1st
|
BLD02-00776
| BLD-Framing/Rough-in | 4/23/2002 | 4/24/2002 | 4/24/2002 12:00:00 AM | A | PART |
|
|
###-#### ANN MARIEneed ele insp. 4/24/2002 9:13:30 AM
|
BLD01-03221
| BLD-Final | 4/23/2002 | 4/24/2002 | 4/24/2002 12:00:00 AM | A | PASS |
|
|
###-#### JUSTIN
|
BLD02-00564
| BLD-Framing/Rough-in | 4/24/2002 | 4/24/2002 | 4/24/2002 12:00:00 AM | P | PART |
|
|
travis ###-#### shear wall need engineering for tall wall and grage nailling and hardware 4/24/2002 3:51:38 PM
|
BLD02-00563
| BLD-Framing/Rough-in | 4/24/2002 | 4/24/2002 | 4/24/2002 12:00:00 AM | P | PART |
|
|
shear wall travis ###-#### tall wall engineering/grage nailling/hold downs 4/24/2002 3:52:15 PM
|
BLD02-00530
| BLD-Framing/Rough-in | 4/24/2002 | 4/24/2002 | 4/24/2002 12:00:00 AM | P | PART |
|
|
shear wall travis ###-#### hardwere tall wall per engineering. 4/24/2002 3:53:57 PM
|
BLD02-00306
| BLD-Framing/Rough-in | 4/24/2002 | 4/24/2002 | 4/24/2002 12:00:00 AM | P | PART |
|
|
travis ###-#### shear wall tall wall hardware per engineering 4/24/2002 3:53:18 PM
|
BLD02-00562
| BLD-Framing/Rough-in | 4/24/2002 | 4/24/2002 | 4/24/2002 12:00:00 AM | P | PART |
|
|
travis ###-#### shear wall tall wall 4/24/2002 3:52:25 PM
|
BLD02-00561
| BLD-Framing/Rough-in | 4/24/2002 | 4/24/2002 | 4/24/2002 12:00:00 AM | P | PART |
|
|
shear wall travis ###-#### tall wall hardware per engineering 4/24/2002 3:52:56 PM
|
BLD01-01837
| BLD-Final | 4/24/2002 | 4/24/2002 | 4/24/2002 12:00:00 AM | P | FAIL |
|
|
1. need mech. final insp.
2. need to reinstal insulation in crawl space at wall.
3. need to insulate supply boots to sub-floor and elbow to furnce in crawl space.
|
MEC02-01085
| Final | 4/22/2002 | 4/24/2002 | 4/23/2002 12:00:00 AM | A | CANC |
|
|
CALL TO MEET ###-#### PAM Disp set to [CANC] by a contractor via Hello! on 04/23/2002 at 10:17:40.
|