BLD02-00615
| BLD-Framing/Rough-in | 4/23/2002 | 4/24/2002 | 4/24/2002 12:00:00 AM | A | PART |
|
|
sheer ###-#### dave c/n posted for garage hd. 4/24/2002 12:37:58 PM
|
MEC02-01088
| Final | 4/23/2002 | 4/24/2002 | 4/24/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC02-01002
| Rough-in | 4/23/2002 | 4/24/2002 | 4/24/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/23/2002 at 13:16:01. Contact: ###-####.posted c/n. 4/24/2002 12:25:37 PM
|
BLD01-01406
| BLD-Framing/Rough-in | 4/23/2002 | 4/24/2002 | 4/24/2002 12:00:00 AM | P | CANC |
|
|
###-#### travis
|
MEC02-00415
| Final | 4/24/2002 | 4/24/2002 | 4/24/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/24/2002 at 08:16:52. Contact: ###-####.
|
BLD02-00400
| BLD-Foundation | 4/24/2002 | 4/24/2002 | 4/24/2002 12:00:00 AM | P | FAIL |
|
|
###-#### Need to epoxy the rebar that is shown on the plans for existing to new concrete, also around the tall walls the plans show only 2 horiz bars and they have not been spaced appart the top bar is far from the top of wall,Due to the inadequate unscaled foundation plan designed by our office. Contractor and builder advised to correct these items. No c/n posted. 4/24/2002 3:59:38 PM
|
MEC02-01091
| Final | 4/24/2002 | 4/24/2002 | 4/24/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/24/2002 at 10:24:56. Contact: ###-####.
|
BLD02-00588
| BLD-Final | 4/24/2002 | 4/24/2002 | 4/24/2002 12:00:00 AM | P | PASS |
|
|
###-####ok perm oc. 4/24/2002 4:06:12 PM
|