Inspections for the day of: Wednesday, April 24, 2002.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00615 BLD-Framing/Rough-in4/23/20024/24/20024/24/2002 12:00:00 AMAPART
sheer ###-#### dave c/n posted for garage hd. 4/24/2002 12:37:58 PM
MEC02-01088 Final4/23/20024/24/20024/24/2002 12:00:00 AMAPASS
###-####
MEC02-01002 Rough-in4/23/20024/24/20024/24/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 04/23/2002 at 13:16:01. Contact: ###-####.posted c/n. 4/24/2002 12:25:37 PM
BLD01-01406 BLD-Framing/Rough-in4/23/20024/24/20024/24/2002 12:00:00 AMPCANC
###-#### travis
MEC02-00415 Final4/24/20024/24/20024/24/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/24/2002 at 08:16:52. Contact: ###-####.
BLD02-00400 BLD-Foundation4/24/20024/24/20024/24/2002 12:00:00 AMPFAIL
###-#### Need to epoxy the rebar that is shown on the plans for existing to new concrete, also around the tall walls the plans show only 2 horiz bars and they have not been spaced appart the top bar is far from the top of wall,Due to the inadequate unscaled foundation plan designed by our office. Contractor and builder advised to correct these items. No c/n posted. 4/24/2002 3:59:38 PM
MEC02-01091 Final4/24/20024/24/20024/24/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/24/2002 at 10:24:56. Contact: ###-####.
BLD02-00588 BLD-Final4/24/20024/24/20024/24/2002 12:00:00 AMPPASS
###-####ok perm oc. 4/24/2002 4:06:12 PM