FIR06-00595
| INSP-Alarm Testing | 4/17/2007 | 4/18/2007 | | P | |
|
|
don - after 5p, said he talked to forrest; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
FIR06-00594
| FIR-Aging Inspection | 4/24/2007 | 4/24/2007 | 5/1/2007 12:30:28 PM | | DEFR |
|
|
|
FIR06-00639
| INSP-Final Inspection | 4/23/2007 | 4/24/2007 | 4/24/2007 9:06:52 PM | A | FAIL |
|
|
Noted several items in need of correction prior to final including painted heads at various locations, missing flex couplings at the standipe risers in the stairwells, mixed head types in the south stairway, missing escutcheons at some locations, leaking head at the model unit bathroom, forward flow completed okay, missing automatic ball drip at the FDC check, need to test AFS monitoring as well.
|
FIR07-00254
| INSP-Sprinkler Rough-in | 4/24/2007 | 4/24/2007 | 4/24/2007 2:22:03 PM | P | FAIL |
|
|
Noted two areas are overspaced, one head is overspaced off an adjacent wall, missing one head as indicated on approved plans, all remaining areas are okay for cover.
|
FIR07-00284
| INSP-Sprinkler Rough-in | 4/24/2007 | 4/24/2007 | 4/24/2007 2:18:29 PM | P | PART |
|
|
Fire sprinkler work is approved for cover.
|
FIR07-00239
| INSP-Sprinkler Rough-in | 4/23/2007 | 4/24/2007 | 4/24/2007 2:17:03 PM | A | PASS |
|
|
Fire sprinkler system modifications are acceptable, rough-in is okay for cover at the drop and hard lid ceilings, final pending completion of ceilings and installation of escutcheons.
|