Inspections for the day of: Friday, April 24, 2009.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00119 Site Preparation4/24/20094/24/20094/24/2009 5:04:00 PMPPASS
BLD09-00322 BLD-Footing4/24/20094/24/20094/24/2009 5:03:41 PMPPASS
Dan Phone #: ###-####
Footing and wall OK
ESC09-00197 Site Preparation4/24/20094/24/20094/24/2009 5:03:02 PMPPASS
BLD09-00544 BLD-Foundation4/24/20094/24/20094/24/2009 5:01:55 PMPPASS
Scheduled by a contractor via Hello! on 4/24/2009 at 10:40:58 AM. Contact: ###-####.
BLD09-00544 BLD-Footing4/24/20094/24/20094/24/2009 5:01:25 PMPPASS
Scheduled by a contractor via Hello! on 4/24/2009 at 10:39:29 AM. Contact: ###-####.
BLD08-01791 BLD-Final4/23/20094/24/20094/24/2009 4:10:08 PMPPART
Burt Phone #: ###-####
OK for Temp Occ. C/N....Problem with groundwater at restrooms under slab concrete allowing the concrete to stay damp. Need time to dry out befor installing vinyl. OK for Perm Occ. when vinyl installed in restrooms.
BLD07-02085 BLD-Energy code compliance4/23/20094/24/20094/24/2009 1:02:09 PMAPASS
1st floor insulation Phone #: ###-#### Internet Inspection Request from: Bryan Herb
MIS09-00058 BLD-Final4/23/20094/24/20094/24/2009 1:01:46 PMAPASS
They have installed all the smoke detectors and the home inspector is sending a letter to certify that he inspected all the GFCI''s and that they are installed where needed. Key is under mat at front door, please use to inspect,lock door and leave key on counter in house when leave, per Kim, the homeowner. Thank you! Phone #: ###-#### Internet Inspection Request from: Connie LaFrainer Corrections completed.
MIS09-00058 DOC - Permit Finaled4/24/20094/24/20094/24/2009 1:00:28 PMPPASS