BLD08-02516
| FIRE-Final Inspection | 4/23/2009 | 4/24/2009 | 4/24/2009 4:57:45 PM | A | PASS |
|
|
Fire life safety final inspection completed satisfactory, project related fire alarm and sprinkler permits finaled.
|
FIR09-00031
| INSP-Final Inspection | 4/23/2009 | 4/24/2009 | 4/24/2009 4:56:33 PM | A | PASS |
|
|
Fire sprinkler permit work passed final inspection, preaction system supervision tested okay, permit finaled.
|
FIR09-00167
| INSP-Final Inspection | 4/24/2009 | 4/24/2009 | 4/24/2009 4:55:28 PM | A | PASS |
|
|
Fire alarm system modifications and interconnections to the clean agent panel and preaction system passed inspection, permit finaled.
|
FIR09-00127
| INSP-Sprinkler Rough-in/Hydro | 4/23/2009 | 4/24/2009 | 4/24/2009 4:53:56 PM | P | FAIL |
|
|
Hydrostatic test for the new preaction system failed due to pressure loss at the guage per site inspection completed by T. Frost.
|
FIR09-00259
| INSP-Sprinkler Rough-in | 4/24/2009 | 4/24/2009 | 4/24/2009 4:52:17 PM | P | PART |
|
|
Overhead piping at the breakroom approved for cover per T. Frost.
|
FIR09-00008
| INSP-Final Inspection | 4/24/2009 | 4/24/2009 | 4/24/2009 3:47:40 PM | P | PASS |
|
|
Fire sprinkler permit work approved for final per T. Frost.
|
FIR09-00008
| INSP-Supply line flush | 4/23/2009 | 4/24/2009 | 4/24/2009 3:46:53 PM | P | PASS |
|
|
UG fire supply line flush completed acceptable per T. Frost.
|
FIR07-00524
| INSP-Final Inspection | 4/23/2009 | 4/24/2009 | 4/24/2009 3:45:42 PM | P | PASS |
|
|
SECOND VISIT for failed first inspection items completed today including retest of post indicator valve, retest for non-functional notification devices, testing for mag lock FA interconnection at the main entry doors, checked relocated 3rd floor manual pull stations, adjusted dB levels at ADA and staff restrooms, map at panel, and elevator controls, supervising station signals checked okay. Fire alarm permit finaled.
|
BLD09-00568
| FIRE-Final Inspection | 4/24/2009 | 4/24/2009 | 4/24/2009 3:22:09 PM | P | FAIL |
|
|
Exit signs and EM lighting at three locations are not functional, fire extinguishers have been serviced but need to be mounted on the wall when painting is completed including the 1st and 2nd levels, electrical junction boxes at various locations are uncovered, floor plan provided does not match actual layout, a racking permit will be required for storage over 8' - racking moved into the warehouse may not be used prior to approval. See items circled or underlined on permit documents for issues discussed.
|
FIR08-00094
| INSP-Alarm Testing | 4/23/2009 | 4/24/2009 | 4/24/2009 1:39:55 PM | A | DEFR |
|
|
Overbooked, rescheduled per phone conversation.
|
FIR09-00156
| INSP-Final Inspection | 4/23/2009 | 4/24/2009 | 4/24/2009 1:39:07 PM | A | DEFR |
|
|
Overbooked, rescheduled as discussed.
|
FIR09-00014
| FIR-Aging Inspection | 4/24/2009 | 4/24/2009 | 4/24/2009 1:35:46 PM | | DONE |
|
|
Need site inspection request when work is finished.
|
FIR08-00234
| INSP-Final Inspection | 4/23/2009 | 4/24/2009 | 4/24/2009 1:34:01 PM | A | PASS |
|
|
Monitor module for alarm condition tie-in at the existing parking garage panel tested okay per condition of agreement letter, smoke alarm retested okay at unit 901, new plan sheets with field modifications verified for changes at the basement and 1st floors, portions of fire alarm work not completed per the scope of this permit yet shown on stamped drawings are to be done under FIR08-00754 (existing parking structure notification devices, FS and FP monitoring, FJ, and east and west elevator control functions), NFPA 72 completion report recieved. NOTE: Contractor to provide revised 18th floor plan for field device location changes, faxed copy of supervising station signals report, NFPA 72 record of inspection and testing per review note #4, and current map at the panel when FIR08-00754 work is finished.
|
BLD06-02303
| FIRE-Final Inspection | 4/23/2009 | 4/24/2009 | 4/24/2009 1:20:24 PM | A | FAIL |
|
|
Missing fire code review notes for on site inspection, noted item #10 per IFC sec. 509 at the fire command center has not been installed, need to coordinate EM lighting and exit signage testing via generator backup with the electrician, project related fire sprinkler permit is not yet approved for final.
|
BLD08-01791
| FIRE-Final Inspection | 4/23/2009 | 4/24/2009 | 4/24/2009 1:14:25 PM | A | PASS |
|
|
Correction notice items field verified for compliance, fire life safety passed, notified contractor.
|
FIR09-00241
| INSP-Final Inspection | 4/23/2009 | 4/24/2009 | 4/24/2009 1:12:54 PM | A | PASS |
|
|
Fire sprinkler work passed site inspection, permit final approved.
|
FIR09-00262
| INSP-Final Inspection | 4/23/2009 | 4/24/2009 | 4/24/2009 1:11:12 PM | A | PASS |
|
|
Scope of work passed final inspection, fire sprinkler permit finaled.
|