BLD11-00425
| BLD-Aging Inspection | 4/24/2013 | 4/24/2013 | 4/25/2013 1:59:22 PM | | DONE |
|
|
|
BLD13-00920
| BLD-Final | 4/24/2013 | 4/24/2013 | 4/25/2013 7:20:46 AM | P | NR |
|
|
|
BLD13-00920
| BLD-Final | 4/23/2013 | 4/24/2013 | 4/25/2013 7:20:06 AM | A | CANC |
|
|
please call ahead for access - mike Phone #: ###-####
|
BLD13-00321
| BLD-Wall Bracing | 4/24/2013 | 4/24/2013 | 4/24/2013 2:12:24 PM | P | DONE |
|
|
Shear Firewall Phone #: ###-#### >> Inspection requested via web by James Larkin
|
GCB12-00154
| GCB-Framing | 4/24/2013 | 4/24/2013 | 4/24/2013 2:11:45 PM | P | NR |
|
|
Dan Phone #: ###-####. no mech. ri inspection.
|
GCB12-00154
| GCB-Fire Wall | 4/24/2013 | 4/24/2013 | 4/24/2013 2:10:04 PM | P | PASS |
|
|
Dan Phone #: ###-####
|
GCB12-00153
| GCB-Framing | 4/24/2013 | 4/24/2013 | 4/24/2013 2:08:13 PM | P | FAIL |
|
|
Dan Phone #: ###-####. 2Hr. firewall to be continous to bottom side of roof deck, north side. Provide 2 layers of 5/8 type x rock at all soffits on 2 hr. wall. Complete all fireblocking at chases, ducts plumbing and furrwed out walls.Provide laydown parapet at south wall 1st. floor, repair laydown parapet were penetrated. Follow point load from beam upstairs. Correction notice posted. do not cover.
|
BLD13-00321
| BLD-Wall Bracing | 4/24/2013 | 4/24/2013 | 4/24/2013 10:34:00 AM | A | PASS |
|
|
Shear Firewall Phone #: ###-#### >> Inspection requested via web by James Larkin. 2nd story wall bracing ok.
|
BLD13-00318
| BLD-Energy code compliance | 4/23/2013 | 4/24/2013 | 4/24/2013 10:33:15 AM | A | PASS |
|
|
Greg Phone #: ###-####. Rigid foam insulation, interior side under slab on grade.
|
BLD12-02045
| BLD-Ceiling Grid Inspection | 4/24/2013 | 4/24/2013 | 4/24/2013 9:06:47 AM | A | PART |
|
|
North half, missing some clips. Will check on final. pending electrical rough in inspection.
|
BLD12-02399
| BLD-Ceiling Grid Inspection | 4/23/2013 | 4/24/2013 | 4/24/2013 9:05:23 AM | A | CANC |
|
|
jeff Phone #: ###-####
|