Inspections for the day of: Thursday, April 24, 2014.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-00496 FIRE-Final Inspection4/24/20144/24/20144/24/2014 4:47:23 PMPPASS
BLD14-00496 FIRE-Final Inspection4/24/20144/24/20144/24/2014 4:46:52 PMPPASS
Okayed for final.
BLD14-00510 FIRE-Final Inspection4/22/20144/24/20144/24/2014 4:44:16 PMAPASS
Final pending door hardware provisions per red-line plan annotations- including the main entry/exit, and two required exits from the central manufacturing area. *Note* To be completed prior to structural final inspection as discussed.
FIR14-00212 INSP-Sprinkler Rough-in4/24/20144/24/20144/24/2014 11:31:29 AMAPART
Fire sprinkler work okayed for cover at the grid ceiling areas.
FIR14-00213 INSP-Sprinkler Rough-in4/24/20144/24/20144/24/2014 11:30:10 AMAPART
Overhead modifications per the scope of work are approved for cover.
BLD13-03042 FIRE-Final Inspection4/23/20144/24/20144/24/2014 11:29:13 AMAPASS
Previous correction items completed. Life safety finaled.
FIR13-00440 INSP-Sprinkler Rough-in4/23/20144/24/20144/24/2014 10:10:57 AMAPART
Inspection for cover at the 1st floor west entry and corridor sheetrock ceiling areas- refer to clouded notes with today's date on stamped plans.