BLD14-00496
| FIRE-Final Inspection | 4/24/2014 | 4/24/2014 | 4/24/2014 4:47:23 PM | P | PASS |
|
|
|
BLD14-00496
| FIRE-Final Inspection | 4/24/2014 | 4/24/2014 | 4/24/2014 4:46:52 PM | P | PASS |
|
|
Okayed for final.
|
BLD14-00510
| FIRE-Final Inspection | 4/22/2014 | 4/24/2014 | 4/24/2014 4:44:16 PM | A | PASS |
|
|
Final pending door hardware provisions per red-line plan annotations- including the main entry/exit, and two required exits from the central manufacturing area. *Note* To be completed prior to structural final inspection as discussed.
|
FIR14-00212
| INSP-Sprinkler Rough-in | 4/24/2014 | 4/24/2014 | 4/24/2014 11:31:29 AM | A | PART |
|
|
Fire sprinkler work okayed for cover at the grid ceiling areas.
|
FIR14-00213
| INSP-Sprinkler Rough-in | 4/24/2014 | 4/24/2014 | 4/24/2014 11:30:10 AM | A | PART |
|
|
Overhead modifications per the scope of work are approved for cover.
|
BLD13-03042
| FIRE-Final Inspection | 4/23/2014 | 4/24/2014 | 4/24/2014 11:29:13 AM | A | PASS |
|
|
Previous correction items completed. Life safety finaled.
|
FIR13-00440
| INSP-Sprinkler Rough-in | 4/23/2014 | 4/24/2014 | 4/24/2014 10:10:57 AM | A | PART |
|
|
Inspection for cover at the 1st floor west entry and corridor sheetrock ceiling areas- refer to clouded notes with today's date on stamped plans.
|