ESC13-00288
| Conference | 4/24/2014 | 4/24/2014 | 4/24/2014 4:44:49 PM | P | DONE |
|
|
Entire ESC plan and installations need maintenance. May enact parcel holds on all inspections. Will wait to see if Mike Jordan feels his CN has been acknowledged.
|
ESC13-00604
| DOC - Permit Finaled | 4/24/2014 | 4/24/2014 | 4/24/2014 3:55:17 PM | P | PASS |
|
|
Finaled.
|
ESC13-00211
| General Inspection | 4/24/2014 | 4/24/2014 | 4/24/2014 3:54:38 PM | | PASS |
|
|
Homeowner contractor has finished house and is occupied. The yard is not yet stabilized/landscaped. Temp BMPs still installed, no corrections required. BLD permit finaled. Pool permit has been closed.
|
ESC13-00604
| General Inspection | 4/24/2014 | 4/24/2014 | 4/24/2014 3:52:52 PM | | PASS |
|
|
Pool is installed, some finishing touches and yard landscaping/stabilization is required. This permit will be finaled, house is still covered under ESC13-00211
|
ESC13-00717
| General Inspection | 4/24/2014 | 4/24/2014 | 4/24/2014 3:46:10 PM | | PASS |
|
|
Finaled.
|
ESC13-00717
| DOC - Permit Finaled | 4/24/2014 | 4/24/2014 | 4/24/2014 3:45:57 PM | P | PASS |
|
|
Project complete. ESC conditions satisfied. All permits finaled.
|
ESC14-00022
| General Inspection | 4/24/2014 | 4/24/2014 | 4/24/2014 2:24:44 PM | | PART |
|
|
No acitivity on 4/24. Need larger rock for effective construction entrances.
Discussed inactive stockpile with RP Jim Conger and advised that if they are to be inacative for an extended period, it should be stabilized to reduce risk of dust.
|
ESC13-00755
| Tracking Control | 4/24/2014 | 4/24/2014 | 4/24/2014 2:07:02 PM | P | FAIL |
|
|
No observable improvement in track out at both entrances. Pictures were taken. This is document continued non-compliance in regards to construction entrances and SWPPP narrative submited for permit.
|
ESC13-00878
| Aging Inspection | 4/24/2014 | 4/24/2014 | 4/24/2014 1:39:55 PM | | PASS |
|
|
Finalized.
|
ESC13-00878
| DOC - Permit Finaled | 4/24/2014 | 4/24/2014 | 4/24/2014 1:39:36 PM | P | PASS |
|
|
House complete and landscaped. No corrections required. BLD permit finaled.
|
ESC13-01279
| General Inspection | 4/24/2014 | 4/24/2014 | 4/24/2014 12:56:33 PM | | PASS |
|
|
Construction entrance still in decent condition. No on or off hauling operations at the moment, minimal trackout. Permit is posted at entrance, perimeter silt fence in good condition.
|
ESC13-00966
| General Inspection | 4/23/2014 | 4/24/2014 | 4/24/2014 12:50:11 PM | A | PASS |
|
|
Permit posted. BMPs installed. No trackout to Talavera; concrete washout in use. Approved.
|
ESC13-00719
| General Inspection | 4/24/2014 | 4/24/2014 | 4/24/2014 12:41:27 PM | | PASS |
|
|
|
ESC13-01078
| Tracking Control | 4/24/2014 | 4/24/2014 | 4/24/2014 12:22:57 PM | P | FAIL |
|
|
Verbal CN issued to RP Dave Wood to provide gravel parking access for homebuilders, which are causing much of the track out. Also spoke with Randy (GC) on site to improve sweeping.
|
ESC13-01077
| Tracking Control | 4/24/2014 | 4/24/2014 | 4/24/2014 12:07:07 PM | P | FAIL |
|
|
Trackout onto Lindsay from multiple parcels. Wood Bros crew onsite and was sweeping with push brooms. I requested that they keep sweeping and will need to order a street sweeper if necessary. Lindsay has no stormwater infrastructure and no adajacent surface water. Will issue verbal CN to Wood bros.
|
ESC13-01279
| Complaint Inspection | 4/24/2014 | 4/24/2014 | 4/24/2014 12:03:30 PM | P | CANC |
|
|
Data entry error. Please disregard.
|
ESC13-00857
| Aging Inspection | 4/24/2014 | 4/24/2014 | 4/24/2014 12:02:57 PM | | PASS |
|
|
WIP. No trackout to St. Patrick. Permits posted, DIs protected.
|
ESC14-00086
| Random Inspection | 4/24/2014 | 4/24/2014 | 4/24/2014 10:24:24 AM | P | PASS |
|
|
The water and utilities have now been installed, so the construction entrance can be replenished for use. No work at time of inspection. No trackout or violations. Vegetative buffer along sidewalk.
|
ESC13-00435
| Aging Inspection | 4/23/2014 | 4/24/2014 | 4/24/2014 10:08:16 AM | P | PART |
|
|
Most structures are complete. Street is now paved and new storm drain facitlities are installed (private system/French drain) Informed RP coconut fiber mats should be installed to protect DIs.
|
ESC13-00323
| General Inspection | 4/24/2014 | 4/24/2014 | 4/24/2014 9:55:46 AM | | PASS |
|
|
Streets are clear. Some work on subdivision playground in progress. No corrections at this time.
|
ESC13-00894
| DOC - Permit Finaled | 4/24/2014 | 4/24/2014 | 4/24/2014 9:43:02 AM | P | PASS |
|
|
Lift station/sewer project complete. Area stabilized with 3/4 gravel rock. ESC conditions satisfied.
|
ESC13-00340
| DOC - Permit Finaled | 4/24/2014 | 4/24/2014 | 4/24/2014 9:13:35 AM | P | PASS |
|
|
Grading and drainage complete for thrift store. All permits for project finaled. Open for business. ESC conditions satisfied.
|
ESC13-00894
| Aging Inspection | 4/24/2014 | 4/24/2014 | 4/24/2014 8:51:11 AM | | PASS |
|
|
|