Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR15-00108 INSP-Final Inspection4/23/20154/24/20154/24/2015 2:19:47 PMPPASS
Two notifications devices repaired to acceptable height per code. Alarm test Pass. Scope of work complete. Permit Finaled.
BLD14-03605 FIRE-Final Inspection4/23/20154/24/20154/24/2015 2:18:56 PMAPASS
Fire Life Safety Pass.
FIR15-00135 INSP-Final Inspection4/23/20154/24/20154/24/2015 2:15:49 PMAPASS
Scope of work complete. Hood suppression system test Pass. Permit Finaled.
FIR15-00202 INSP-Sprinkler Rough-in/Hydro4/23/20154/24/20154/24/2015 2:14:25 PMAPART
Two new recessed heads in drop ceiling ok to cover.
FIR14-00815 INSP-Sprinkler Rough-in4/23/20154/24/20154/24/2015 12:06:18 PMAPART
Sofits at sec 2 on 3rd floor ok to cover. One drop in RM 315 at bathroom to be straightened. Verifed previous C/N items in rooms 420, 424, 426, 423, 414 and 412 corrected satisfactory.
FIR15-00002 INSP-Sprinkler Rough-in4/23/20154/24/20154/24/2015 10:38:41 AMAPART
Ok to cover main and branch and arm overs on 1st floor. A few missing hangars, contractor to correct. Verified all uprights on 1st floor, except one located above back stair well and one under front stairwell, to be verified later. All pendant locations including dry pendant drops to be verifed later. Gave OK to change from pendant to sidewall in front stair well, to be installed centered on soffit and 4" below.
FIR13-00167 INSP-Sprinkler Rough-in4/23/20154/24/20154/24/2015 8:49:23 AMAPART
Underground 8" main from PIV to underground parking garage OK to cover. Main has 4' of coverage at PIV due to location of united water's main, and then drops to over 5' of coverage at bldg connection.