FIR15-00108
| INSP-Final Inspection | 4/23/2015 | 4/24/2015 | 4/24/2015 2:19:47 PM | P | PASS |
|
|
Two notifications devices repaired to acceptable height per code. Alarm test Pass. Scope of work complete. Permit Finaled.
|
BLD14-03605
| FIRE-Final Inspection | 4/23/2015 | 4/24/2015 | 4/24/2015 2:18:56 PM | A | PASS |
|
|
Fire Life Safety Pass.
|
FIR15-00135
| INSP-Final Inspection | 4/23/2015 | 4/24/2015 | 4/24/2015 2:15:49 PM | A | PASS |
|
|
Scope of work complete. Hood suppression system test Pass. Permit Finaled.
|
FIR15-00202
| INSP-Sprinkler Rough-in/Hydro | 4/23/2015 | 4/24/2015 | 4/24/2015 2:14:25 PM | A | PART |
|
|
Two new recessed heads in drop ceiling ok to cover.
|
FIR14-00815
| INSP-Sprinkler Rough-in | 4/23/2015 | 4/24/2015 | 4/24/2015 12:06:18 PM | A | PART |
|
|
Sofits at sec 2 on 3rd floor ok to cover. One drop in RM 315 at bathroom to be straightened. Verifed previous C/N items in rooms 420, 424, 426, 423, 414 and 412 corrected satisfactory.
|
FIR15-00002
| INSP-Sprinkler Rough-in | 4/23/2015 | 4/24/2015 | 4/24/2015 10:38:41 AM | A | PART |
|
|
Ok to cover main and branch and arm overs on 1st floor. A few missing hangars, contractor to correct. Verified all uprights on 1st floor, except one located above back stair well and one under front stairwell, to be verified later. All pendant locations including dry pendant drops to be verifed later. Gave OK to change from pendant to sidewall in front stair well, to be installed centered on soffit and 4" below.
|
FIR13-00167
| INSP-Sprinkler Rough-in | 4/23/2015 | 4/24/2015 | 4/24/2015 8:49:23 AM | A | PART |
|
|
Underground 8" main from PIV to underground parking garage OK to cover. Main has 4' of coverage at PIV due to location of united water's main, and then drops to over 5' of coverage at bldg connection.
|