Inspections for the day of: Wednesday, April 24, 2019.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE17-01799 ELE-Aging Inspection4/24/20194/24/20194/30/2019 9:54:18 AM PASS
Job completed as per Daryl DeGrange on 4/24/19
ELE19-01440 Electrical Rough-In4/24/20194/24/20194/24/2019 2:19:40 PMPPASS
Back parking area Phone #: ###-#### Inspection requested via web by Jason Wicks Ok cover ground work for pre-cast parking lot lights on S side of property.
ELE17-01654 Final4/24/20194/24/20194/24/2019 2:05:32 PMPPASS
ARC fault protected smoke detector was added in mstr bed.
ELE18-04282 Final4/24/20194/24/20194/24/2019 1:40:36 PMPPASS
Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok final.
ELE18-04285 Final4/24/20194/24/20194/24/2019 1:39:53 PMPPASS
Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok final.
ELE19-00617 Final4/24/20194/24/20194/24/2019 12:36:45 PMPPASS
front door code 234 Phone #: ###-#### Inspection requested via web by cal crosby Ok final.
ELE18-02184 Final4/23/20194/24/20194/24/2019 12:36:17 PMAPART
Electrical final for the new gym. Jason is the contact. ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates Occupancy ok for gym area and locker rooms. Rooftop heat trace needs GFI protection. Jason is going to install GFI protection and call back in for a final inspection.
ELE19-01401 Electrical Rough-In4/23/20194/24/20194/24/2019 10:18:02 AMAPASS
Garage is ready for inspection. Need to look at existing panel located in the little utility closet in the back of the garage. Working clearances is. An issue may need to be flipped around Phone #: ###-#### Inspection requested via web by Kurt Carlson Ok cover garage. Panel in back room area will need to be turned to face in garage as pool equipt surrounds entire work space area in front of panel.
ELE19-01475 Temporary Service4/23/20194/24/20194/24/2019 10:04:11 AMAPASS
Phone #: ###-#### Inspection requested via web by Ryan Wilson t/s u/g n ok
ELE18-02313 Final4/23/20194/24/20194/24/2019 9:27:09 AMAPASS
We need an electrical final for the gym, locker room area please. Thank you Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok final Gym and cafeteria.
ELE19-00452 Final4/23/20194/24/20194/24/2019 9:08:24 AMAPASS
Phone #: ###-#### Inspection requested via web by David McClellan Ok final.
ELE19-01466 Temporary Service4/23/20194/24/20194/23/2019 12:14:52 PMAPASS
per Mark Phone #: 2###-#### Temp pole was relocated. t/s o/h rec ok
ELE18-02746 Final4/23/20194/24/20194/23/2019 12:08:24 PMAPASS
Kevin will Meet you there. If you have any questions please feel free to contact Clay ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok final. Looked at on 4/23/19