BLD17-01000
| FIRE-Final Inspection | 4/24/2019 | 4/24/2019 | 4/24/2019 4:39:22 PM | P | PART |
|
|
Life fire safety inspection for phase 2 TCO complete.
|
FIR17-00508
| INSP-Final Inspection | 4/23/2019 | 4/24/2019 | 4/24/2019 4:32:57 PM | P | PART |
|
|
Fire alarm inspection for phase 2 TCO complete.
please go after 3:30, this is a school-Joe Phone #: ###-####
|
FIR18-00610
| INSP-Sprinkler Rough-in/Hydro | 4/24/2019 | 4/24/2019 | 4/24/2019 2:26:48 PM | P | PART |
|
|
Rough to cover inspection for overhead fire sprinkler piping above suspended ceilings in elevator lobbies on levels 1 and 2 complete, levels 1 and 2 elevator lobbies approved for cover.
Mike Phone #: ###-####
|
FIR18-00398
| INSP-Sprinkler Rough-in/Hydro | 4/22/2019 | 4/24/2019 | 4/24/2019 2:02:26 PM | A | DONE |
|
|
Hydrostatic test for undergorund supply witnessed, no pressure loss observed.
Kenny Caldwell is the contact for this Hydro/Flush Inspection. We are hoping for an AM appointment and trying to coordinate with Stacey @ Suez. We appreciate your help. Have a great day. Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD18-03799
| FIRE-Final Inspection | 4/24/2019 | 4/24/2019 | 4/24/2019 1:16:33 PM | P | PASS |
|
|
Previously noted items have been corrected, final life fire safety inspection complete.
Steve Phone #: ###-####
|
FIR19-00223
| INSP-Final Inspection | 4/24/2019 | 4/24/2019 | 4/24/2019 12:38:43 PM | P | PASS |
|
|
Final fire alarm inspection complete.
Robert Phone #: ###-####
|
FIR19-00222
| INSP-Final Inspection | 4/24/2019 | 4/24/2019 | 4/24/2019 12:37:41 PM | P | PASS |
|
|
Final fire alarm inspection complete.
Robert Phone #: ###-####
|
FIR18-00027
| INSP-Final Inspection | 4/23/2019 | 4/24/2019 | 4/24/2019 12:37:00 PM | A | PASS |
|
|
Final fire sprinkler inspection complete.
We would like to perform this in conjunction with fire alarm testing. Please call Lonnie with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
FIR17-00579
| INSP-Final Inspection | 4/23/2019 | 4/24/2019 | 4/24/2019 12:36:24 PM | A | PASS |
|
|
Final inspection for underground supply complete.
Please call Lonnie with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
BLD18-01083
| FIRE-Conference | 4/23/2019 | 4/24/2019 | 4/24/2019 11:15:56 AM | A | DONE |
|
|
Fire conference complete, egress paths discussed as well as the addition of an exit sign and two being removed.
John Phone #: ###-####
|
FIR18-00673
| INSP-Final Inspection | 4/24/2019 | 4/24/2019 | 4/24/2019 10:32:55 AM | P | CANC |
|
|
Rescheduled for 25APR2019 per conversation with point of contact, this request is cancelled.
Todd Phone #: ###-####
|
FIR19-00180
| INSP-Sprinkler Rough-in | 4/23/2019 | 4/24/2019 | 4/24/2019 10:32:14 AM | A | PASS |
|
|
Tenting inspection complete, overhead fire sprinkler piping approved for cover.
john Phone #: ###-####
|
FIR18-00501
| INSP-Sprinkler Rough-in/Hydro | 4/23/2019 | 4/24/2019 | 4/24/2019 10:31:32 AM | A | DONE |
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.
George Jess is the contact, he wants this to be a 200 lbs hydro only inspection. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00398
| INSP-Supply line flush | 4/22/2019 | 4/24/2019 | 4/24/2019 10:16:29 AM | A | DONE |
|
|
Underground main line flush complete.
Kenny Caldwell is the contact for this Hydro/Flush Inspection. We are hoping for an AM appointment and trying to coordinate with Stacey @ Suez. We appreciate your help. Have a great day. Phone #: ###-#### Inspection requested via web by Stan Beus
|