ELE20-01385
| Conference | 4/23/2020 | 4/24/2020 | 4/24/2020 1:49:48 PM | P | PASS |
|
|
WIll be changing service out on 5/1. Would like to schedule a Conference Phone #: ###-#### Inspection requested via web by Greg Ballenger.. discussed new service...grounding up dating, refeed existing sub panel-not split bus, fix existing double fed circuits at service now
|
ELE20-01064
| Final | 4/24/2020 | 4/24/2020 | 4/24/2020 12:34:11 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Greg Idsinga...not ready....will reschedule...contractor is aware of
|
ELE18-01099
| Permanent Service | 4/20/2020 | 4/24/2020 | 4/24/2020 11:11:44 AM | P | PASS |
|
|
ok with video/photo // Luke Phone #: ###-####...p/s u/g reconnect ok
|
ELE20-00657
| Rough-In Permanent Service | 4/24/2020 | 4/24/2020 | 4/24/2020 10:51:03 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by kevin blackmon... rough ok to cover p/s u/g new ok
|
MIS20-00129
| ELE-Conference | 4/24/2020 | 4/24/2020 | 4/24/2020 10:49:42 AM | P | PASS |
|
|
no electrical permits...correction notice posted...5 days given
|
ELE19-04036
| Electrical Rough-In | 4/23/2020 | 4/24/2020 | 4/24/2020 10:24:03 AM | A | PASS |
|
|
Requesting 10:00 am inspection time. Install 1 wall sign Phone #: ###-#### Inspection requested via web by Ken Olsen...UL listing and disconnect
|
ELE20-01026
| Electrical Rough-In | 4/23/2020 | 4/24/2020 | 4/24/2020 10:23:31 AM | A | PASS |
|
|
Requesting 10:00 am inspection time. Run 1 circuit from breaker box to sign location Phone #: ###-#### Inspection requested via web by Ken Olsen...M/C from panel thru drop ceiling...1 junction box above ceiling....ok
|
ELE20-01025
| Electrical Rough-In | 4/24/2020 | 4/24/2020 | 4/24/2020 9:30:25 AM | A | PASS |
|
|
We need a wall rough. Tobias is site contact. Thank you Phone #: ###-#### Inspection requested via web by Stacie Tasker...wall inspection complete...ground access, junction boxes accessible, and pipe feeds complete
|
ELE20-01025
| Conference | 4/24/2020 | 4/24/2020 | 4/24/2020 9:28:49 AM | A | PASS |
|
|
We need a wall rough. Tobias is site contact. Thank you Phone #: ###-#### Inspection requested via web by Stacie Tasker... discussed grounding of services and proving existing grounding still working....unable to verify without metering...250.53 (A) & (D)
|
ELE20-00331
| Rough-In Permanent Service | 4/23/2020 | 4/24/2020 | 4/24/2020 8:42:14 AM | A | PASS |
|
|
I won''t be on-site Friday but if there are any issues at all please let me know. There is one 12/2 romex not stuffed in the panel, that isn''t mine. It belongs to the solar guys and they have their own permit. Let me know if you have any questions, thank you! Dan Phone #: ###-#### Inspection requested via web by Dan Jennings.... rough ok to cover p/s u/g new ok
|
ELE20-00332
| Rough-In Permanent Service | 4/23/2020 | 4/24/2020 | 4/24/2020 8:41:31 AM | A | PASS |
|
|
I won''t be on-site Friday but if there are any issues at all please let me know. There is one 12/2 romex not stuffed in the panel, that isn''t mine. It belongs to the solar guys and they have their own permit. Let me know if you have any questions, thank you! Dan Phone #: ###-#### Inspection requested via web by Dan Jennings... rough in ok to cover p/s u/g new ok
|
ELE20-01400
| Electrical Rough-In | 4/22/2020 | 4/24/2020 | 4/23/2020 7:20:26 AM | A | CANC |
|
|
Please call Roger for access to the facility prior to arrival. Secured area for Ada County Jail Phone #: ###-#### >> Inspection requested via web by Kevin Perez Inspection cancelled from web by: Kevin Perez
|
MIS20-00112
| ELE-Conference | 4/20/2020 | 4/24/2020 | 4/20/2020 11:22:49 AM | A | PASS |
|
|
Call Doherty Electric and verify corrections made...###-####...finaled 4/20/20
|