Inspections for the day of: Friday, April 24, 2020.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00920 General Inspection4/24/20204/24/20204/30/2020 8:22:39 AM CANC
ESC18-01167 General Inspection4/24/20204/24/20204/29/2020 3:04:21 PM PASS
ESC18-01102 Site Final4/22/20204/24/20204/29/2020 2:35:44 PMPNR
DI bag in front of home still installed.

Filled from multiple sites. May need to call in ACHD for service with winch
ESC18-01433 Site Final4/23/20204/24/20204/29/2020 1:49:23 PMPPASS
Home complete, occupied, and fully landscaped & stabilized with irrigation available. ESC permit finaled
ESC18-00498 General Inspection4/24/20204/24/20204/29/2020 12:34:49 PM PASS
BMPs installed. No new erosion or issues observed on hillsides. Only one active home on Chardie. New landscaping and trees have been placed on access road to pond. There is a stockplile locateed by pond that may need stabilization. Silt fence installed around lower perimeter of this area.

Home with erosion on Nines Ridge has impleemented stabilization (will follow up with Bruce with CM Company). No requests at this time - looks like it needs to be seeded.

No requests at this time.
ESC19-00205 Tracking Control4/23/20204/24/20204/24/2020 3:07:02 PMPPASS
RP had street and sidewalks swept as requested
ESC18-01769 General Inspection4/24/20204/24/20204/24/2020 3:06:37 PM CANC
ESC20-00049 Site Preparation4/23/20204/24/20204/24/2020 9:38:04 AMAPASS
Steve Phone #: ###-####

Approved to start. Staging with large parking lot that drains to the grass. Will begin tree removal and earth work next week for addition. Will have above ground container for concrete washout.

Follow up inspection scheduled
ESC18-00900 General Inspection4/24/20204/24/20204/24/2020 8:29:45 AM PASS