PLM96-00939
| INSP - Plumbing Rough-in | 4/24/1996 | 4/25/1996 | 4/25/1996 12:00:00 AM | A | PASS |
|
|
04/24/96 347 - THURS 9:30 w/c 1 basin 1 shr 1 r/i o/k 4/25/6 347
|
PLM96-01033
| INSP - Sprinkler & Backflow | 4/24/1996 | 4/25/1996 | 4/25/1996 12:00:00 AM | A | PASS |
|
|
04/24/96 347 - sp. o/k 4/25/6
|
PLM95-00861
| INSP - Plumbing Rough-in | 4/25/1996 | 4/25/1996 | 4/25/1996 12:00:00 AM | P | PASS |
|
|
04/25/96 347 - BLD L w/c 36 BASIN 42 TUB 36 SINK 24 WH 24 W/B 24 R/I O/K 4/25/6 347
|
PLM95-01713
| INSP - Final | 4/25/1996 | 4/25/1996 | 4/25/1996 12:00:00 AM | P | PART |
|
|
04/25/96 347 - FINAL ON 2ND FLOOR O/K FOR FINAL OCCUPANCY 4/25/6 347
|