Inspections for the day of: Tuesday, April 25, 2000.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-00572 BLD-Foundation4/24/20004/25/20004/25/2000 12:00:00 AMAPASS
Kelly ###-#### 3 rd lift ok special insp. reports ok on site . 4/25/00 9:18:14 AM
BLD99-02619 BLD-Framing/Rough-in4/24/20004/25/20004/25/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/24/2000 at 12:48:35. Contact: ###-####.
BLD99-02974 BLD-Framing/Rough-in4/24/20004/25/20004/25/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 04/24/2000 at 14:37:51. Contact: ###-####. 16ga double studs at each holddown instaled inverted to the engineered design. requirer engineer to approve instalation or redesign for loading. all other atchments appear to be per plan. 4/25/00 11:32:56 AM
BLD99-02195 BLD-Footing4/24/20004/25/20004/25/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/24/2000 at 15:17:08. Contact: ###-####. rebar ok pending special insp. report. 4/25/00 9:29:23 AM
MEC00-01188 Rough-in4/25/20004/25/20004/25/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 04/25/2000 at 07:58:18. Contact: ###-####. c/n gas test failled. 4/25/00 3:03:00 PM
MEC00-01188 Pressure Test4/25/20004/25/20004/25/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 04/25/2000 at 07:58:45. Contact: ###-####.
BLD00-00800 BLD-Framing/Rough-in4/25/20004/25/20004/25/2000 12:00:00 AMPFAIL
###-#### 6 inch steel studs req. 4 point atchment / 100 plf due to height req arch to address load bearing wall lateral loading over height studs. pending others. 4/25/00 5:25:14 PM
BLD00-00692 BLD-Framing/Rough-in4/25/20004/25/20004/25/2000 12:00:00 AMPPASS
###-#### call first to meet there frame ok. 4/25/00 4:18:35 PM
BLD00-00928 BLD-Footing4/25/20004/25/20004/25/2000 12:00:00 AMPPASS
###-#### ft ok set backs ok. 4/25/00 2:20:58 PM
BLD98-03746 BLD-Final4/24/20004/25/20004/25/2000 12:00:00 AMPNR
Jeremy ###-####
BLD99-00180 BLD-Final4/24/20004/25/20004/25/2000 12:00:00 AMPPART
Jeremy ###-#### final ok pending others 4/25/00 4:02:13 PM