PLM00-00937
| Groundwork | 4/24/2000 | 4/25/2000 | 4/25/2000 12:00:00 AM | A | PART |
|
|
g/w coit ###-#### next 4 sw ok 4/25/00 9:33:03 AM
|
PLM00-01230
| Sprinkler (Final) | 4/24/2000 | 4/25/2000 | 4/25/2000 12:00:00 AM | A | FAIL |
|
|
###-#### unions required, test required, no tee allowed upstream of dcva 4/25/00 9:32:38 AM left notice no answer to call 4/25/00 9:36:40 AM
|
PLM00-01171
| Water and/or Sewer | 4/25/2000 | 4/25/2000 | 4/25/2000 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 330 On 4/25/00 map
|
PLM00-01184
| Water and/or Sewer | 4/25/2000 | 4/25/2000 | 4/25/2000 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 330 On 4/25/00 map
|
PLM00-01218
| Water and/or Sewer | 4/25/2000 | 4/25/2000 | 4/25/2000 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 330 On 4/25/00 map
|
PLM99-04209
| Plumbing Rough-in | 4/25/2000 | 4/25/2000 | 4/25/2000 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 330 On 4/25/00 r/i ok
|
PLM99-03659
| Other | 4/25/2000 | 4/25/2000 | 4/25/2000 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 330 On 4/25/00 water heater conference ok t&p drain with in 2' of garage floor
|
PLM00-01169
| Plumbing Rough-in | 4/25/2000 | 4/25/2000 | 4/25/2000 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 330 On 4/25/00 addition only
|
PLM99-03863
| Plumbing Rough-in | 4/25/2000 | 4/25/2000 | 4/25/2000 12:00:00 AM | P | PASS |
|
|
raul ###-#### 2nd half
|
PLM99-03865
| Plumbing Rough-in | 4/25/2000 | 4/25/2000 | 4/25/2000 12:00:00 AM | P | FAIL |
|
|
raul ###-#### piping incomplete 4/25/00 2:43:24 PM
|
PLM00-01236
| Water and/or Sewer | 4/25/2000 | 4/25/2000 | 4/25/2000 12:00:00 AM | P | FAIL |
|
|
###-#### piping incomplete 4/25/00 3:15:21 PM
|
PLM00-00752
| Plumbing Rough-in | 4/25/2000 | 4/25/2000 | 4/25/2000 12:00:00 AM | P | FAIL |
|
|
Gary Tracy ###-#### wv tet failed, pex less than 12" from recessed light, secure wh stubouts, many bad joints in w&v system, vents backgraded, main vtr trapped, vent below trap wier, ks waste backgraded, hang pvc every 4' 4/25/00 5:02:36 PM
|
PLM00-01240
| Plumbing Rough-in | 4/25/2000 | 4/25/2000 | 4/25/2000 12:00:00 AM | P | PASS |
|
|
after 1:30 ###-####
|
PLM00-00783
| Water and/or Sewer | 4/25/2000 | 4/25/2000 | 4/25/2000 12:00:00 AM | P | PART |
|
|
tech plum --###-#### water & swr tech is takig outside portion of this project part sewer ok from ldg to withi 20 foot of tiein 4/25/00 3:49:07 PM
|
PLM00-01246
| Sprinkler (Final) | 4/25/2000 | 4/25/2000 | 4/25/2000 12:00:00 AM | P | FAIL |
|
|
after 3pm ###-#### Craig test dcva, no tees allowed upstream of dcva 4/25/00 3:29:47 PM
|
PLM00-00937
| Groundwork | 4/25/2000 | 4/25/2000 | 4/25/2000 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 330 On 4/25/00 3 more sw ok 4/25/00 11:14:54 AM
|