ELE00-01199
| Electrical Rough-In | 4/24/2000 | 4/25/2000 | 4/25/2000 12:00:00 AM | A | PASS |
|
|
larry ###-#### pool pool bonding; metal fixtures. 4/26/00 11:40:07 AM
|
ELE00-01319
| Final | 4/24/2000 | 4/25/2000 | 4/25/2000 12:00:00 AM | A | FAIL |
|
|
###-#### Numerous corrections; posted. Called contractor. 4/26/00 11:37:01 AM
|
ELE00-01426
| Temporary Service | 4/24/2000 | 4/25/2000 | 4/25/2000 12:00:00 AM | A | PASS |
|
|
###-#### Temp. pole 4/26/00 11:38:17 AM
|
ELE00-00693
| Final | 4/24/2000 | 4/25/2000 | 4/25/2000 12:00:00 AM | A | FAIL |
|
|
this is for a temp occ cathy ###-#### Not ready\ 4/26/00 11:39:22 AM
|
ELE00-00600
| Final | 4/24/2000 | 4/25/2000 | 4/25/2000 12:00:00 AM | A | FAIL |
|
|
Emmett ###-#### Hallway recepticle, reversed polarity; no power to GFCI recepticles in garage/outside plugs. 4/26/00 11:38:02 AM
|
ELE00-00550
| Final | 4/25/2000 | 4/25/2000 | 4/25/2000 12:00:00 AM | P | PASS |
|
|
###-#### Bath remodel; compelted 4/26/00 11:46:18 AM
|
ELE00-01436
| Electrical Rough-In | 4/25/2000 | 4/25/2000 | 4/25/2000 12:00:00 AM | P | PASS |
|
|
###-#### Pool bonding ok. 4/26/00 11:45:34 AM
|
ELE00-00868
| Final | 4/25/2000 | 4/25/2000 | 4/25/2000 12:00:00 AM | P | PASS |
|
|
reinspection - Jim Schmer has the low down -don ###-#### Corrections completed; GFCI per J. Schmere 4/26/00 11:46:34 AM
|
ELE00-00300
| Electrical Rough-In | 4/25/2000 | 4/25/2000 | 4/25/2000 12:00:00 AM | P | FAIL |
|
|
tyler ###-#### Fixture wire supports required; ceiling deli & pharmacy area. 4/26/00 11:46:07 AM
|
ELE00-01197
| Final | 4/25/2000 | 4/25/2000 | 4/25/2000 12:00:00 AM | P | PASS |
|
|
###-#### Completed 4/26/00 11:45:41 AM
|