Inspections for the day of: Tuesday, April 25, 2000.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMarv Burrus
TitleELE
Phone #340-1297
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE00-01199 Electrical Rough-In4/24/20004/25/20004/25/2000 12:00:00 AMAPASS
larry ###-#### pool pool bonding; metal fixtures. 4/26/00 11:40:07 AM
ELE00-01319 Final4/24/20004/25/20004/25/2000 12:00:00 AMAFAIL
###-#### Numerous corrections; posted. Called contractor. 4/26/00 11:37:01 AM
ELE00-01426 Temporary Service4/24/20004/25/20004/25/2000 12:00:00 AMAPASS
###-#### Temp. pole 4/26/00 11:38:17 AM
ELE00-00693 Final4/24/20004/25/20004/25/2000 12:00:00 AMAFAIL
this is for a temp occ cathy ###-#### Not ready\ 4/26/00 11:39:22 AM
ELE00-00600 Final4/24/20004/25/20004/25/2000 12:00:00 AMAFAIL
Emmett ###-#### Hallway recepticle, reversed polarity; no power to GFCI recepticles in garage/outside plugs. 4/26/00 11:38:02 AM
ELE00-00550 Final4/25/20004/25/20004/25/2000 12:00:00 AMPPASS
###-#### Bath remodel; compelted 4/26/00 11:46:18 AM
ELE00-01436 Electrical Rough-In4/25/20004/25/20004/25/2000 12:00:00 AMPPASS
###-#### Pool bonding ok. 4/26/00 11:45:34 AM
ELE00-00868 Final4/25/20004/25/20004/25/2000 12:00:00 AMPPASS
reinspection - Jim Schmer has the low down -don ###-#### Corrections completed; GFCI per J. Schmere 4/26/00 11:46:34 AM
ELE00-00300 Electrical Rough-In4/25/20004/25/20004/25/2000 12:00:00 AMPFAIL
tyler ###-#### Fixture wire supports required; ceiling deli & pharmacy area. 4/26/00 11:46:07 AM
ELE00-01197 Final4/25/20004/25/20004/25/2000 12:00:00 AMPPASS
###-#### Completed 4/26/00 11:45:41 AM