PLM01-00798
| Final | 4/24/2001 | 4/25/2001 | 4/25/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/24/2001 at 09:57:34. Contact: ###-####.
|
PLM00-04403
| Water and/or Sewer | 4/24/2001 | 4/25/2001 | 4/25/2001 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 330 On 4/24/2001 4:59:52 PM interceptor test ok 4/25/2001 1:07:08 PM
|
PLM01-01268
| Sprinkler (Final) | 4/24/2001 | 4/25/2001 | 4/25/2001 12:00:00 AM | P | PASS |
|
|
colin 880-*5229
|
PLM01-01273
| Water and/or Sewer | 4/25/2001 | 4/25/2001 | 4/25/2001 12:00:00 AM | P | PASS |
|
|
greg ###-#### w/s final
|
PLM01-01233
| Plumbing Rough-in | 4/25/2001 | 4/25/2001 | 4/25/2001 12:00:00 AM | P | PASS |
|
|
Final???? John ###-#### work #** sink for beauty salon call before going out due to existing conditions the salon sink is tied onto the waste arm for the lav. final ok 4/25/2001 3:02:12 PM
|
PLM00-03202
| Plumbing Rough-in | 4/25/2001 | 4/25/2001 | 4/25/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/25/2001 at 10:29:19. Contact: ###-####. 8" rd west side from roof to 10' above fab deck, 4" rd from roof thru fab deck to exterior 4/25/2001 4:20:14 PM
|