Inspections for the day of: Wednesday, April 25, 2001.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-01193 Final4/24/20014/25/20014/25/2001 12:00:00 AMAPASS
Dick ###-####
BLD01-00879 BLD-Foundation4/24/20014/25/20014/25/2001 12:00:00 AMAPART
late am please keith ###-#### footing and foundation
w.i.p. verbal corrections, ok to pour when ready 4/25/2001 11:21:40 AM
MEC01-00847 Final4/24/20014/25/20014/25/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/24/2001 at 15:27:44. Contact: ###-####.
BLD01-00195 BLD-Framing/Rough-in4/24/20014/25/20014/25/2001 12:00:00 AMAPART
c/n,ok to rock unaffected areas /// energy code ok 4/25/2001 10:50:59 AM
BLD01-00535 BLD-Framing/Rough-in4/24/20014/25/20014/25/2001 12:00:00 AMPPART
fr insp walt ###-####
c/n, ok to insulate after trades are signed off 4/25/2001 1:40:10 PM
BLD01-00246 BLD-Framing/Rough-in4/25/20014/25/20014/25/2001 12:00:00 AMPPART
###-#### cole
c/n posted, ok to rock unaffected areas 4/25/2001 3:11:43 PM
BLD01-00245 BLD-Framing/Rough-in4/25/20014/25/20014/25/2001 12:00:00 AMPPASS
cole ###-####
energy code ok also 4/25/2001 4:08:36 PM
BLD01-00258 BLD-Framing/Rough-in4/25/20014/25/20014/25/2001 12:00:00 AMPPART
###-####
c/n , ok to insulate, no mech. needed 4/25/2001 4:25:12 PM
BLD01-00587 BLD-Framing/Rough-in4/25/20014/25/20014/25/2001 12:00:00 AMPPART
shear panel ###-####
exterior shear ok 4/25/2001 12:41:19 PM
BLD01-00195 BLD-Framing/Rough-in4/25/20014/25/20014/25/2001 12:00:00 AMPPASS
verify b vent clearance, strap in garage, stair stringer, fire stop 4/25/2001 10:49:20 AM