Inspections for the day of: Thursday, April 25, 2002.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM01-02535 Final4/24/20024/25/20024/25/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 04/24/2002 at 17:13:06. Contact: ###-####. hugo needs to wlk thru and pick up loose ends 4/25/2002 10:41:01 AM
PLM01-02563 Final4/24/20024/25/20024/25/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 04/24/2002 at 17:13:50. Contact: ###-####. hugo needs to walk thru and pick up loose ends 4/25/2002 10:40:33 AM
PLM01-02612 Final4/24/20024/25/20024/25/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 04/24/2002 at 17:14:34. Contact: ###-####. not ready hugo needs to walk thru and pick up loose ends 4/25/2002 10:40:06 AM
PLM02-00906 Groundwork4/24/20024/25/20024/25/2002 12:00:00 AMAPART
GRIDS A THRU B AND GRIDS 3 AND 6 ###-#### water lines to 2 bury hydrants test ok 4/25/2002 9:22:16 AM
PLM02-01101 Water and/or Sewer4/24/20024/25/20024/25/2002 12:00:00 AMANR
Scheduled by Inspector: 330 On 4/24/2002 4:24:49 PM
PLM02-01101 Groundwork4/25/20024/25/20024/25/2002 12:00:00 AMAPASS
Added by Inspector: 330 On 4/25/2002 9:37:09 AM g/w ok
PLM02-01061 Sprinkler (Final)4/25/20024/25/20024/25/2002 12:00:00 AMAPASS
Added by Inspector: 330 On 4/25/2002 9:58:59 AM new shutoff and drain valves, retest on existing dcva final ok
PLM02-01131 Water and/or Sewer4/25/20024/25/20024/25/2002 12:00:00 AMPPART
###-#### 4/25/2002 3:05:24 PM water service ok 4/25/2002 3:05:35 PM
PLM02-00696 Plumbing Rough-in4/25/20024/25/20024/25/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/25/2002 at 11:01:08. Contact: ###-####.
PLM02-01132 Water and/or Sewer4/25/20024/25/20024/25/2002 12:00:00 AMPNR
LATE PM ###-#### rocks 4/25/2002 3:20:59 PM
PLM01-02563 Final4/25/20024/25/20024/25/2002 12:00:00 AMPPART
Added by Inspector: 330 On 4/25/2002 4:51:37 PM unit 203-needs main water shutoff valve handle unit 104- too much stress on the t&p drain piping
PLM01-02612 Final4/25/20024/25/20024/25/2002 12:00:00 AMPPART
Added by Inspector: 330 On 4/25/2002 4:52:36 PM unit 101- main shutoff valve handle missing
PLM02-00490 Plumbing Rough-in4/25/20024/25/20024/25/2002 12:00:00 AMPPASS
Added by Inspector: 330 On 4/25/2002 5:11:14 PM
PLM01-04128 Final4/25/20024/25/20024/25/2002 12:00:00 AMPFAIL
###-#### test dcva, remove flex from lav waste, install c.o. covers, turn on water to shower, work to be done by a licensed plumber, set trim on the back 1/2 of the project. 4/25/2002 2:02:23 PM
PLM02-00605 Water and/or Sewer4/24/20024/25/20024/25/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 04/24/2002 at 16:07:57. Contact: ###-####. SEWER OK WATER SERVICE STILL NEEDS TEST, OK TO COVER 4/25/2002 3:28:17 PM
PLM02-00337 Final4/25/20024/25/20024/25/2002 12:00:00 AMPPASS
###-#### TIM
PLM02-00722 Plumbing Rough-in4/25/20024/25/20024/25/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/25/2002 at 08:16:40. Contact: ###-####.
PLM02-01126 Plumbing Rough-in4/25/20024/25/20024/25/2002 12:00:00 AMPFAIL
r/i ###-####- shawn -tested water with working pressure--key above gar light for access LEAK ON 3" JUST BELOW CLOSET FLANGE 4/25/2002 3:48:23 PM