MIS02-00087
| BLD-Final | 4/24/2002 | 4/25/2002 | 4/25/2002 12:00:00 AM | A | PART |
|
|
FOR A BLOCK AND TIE PAULINE ###-#### . Ok to skirt. 4/25/2002 1:02:13 PM
|
BLD02-00104
| BLD-Final | 4/24/2002 | 4/25/2002 | 4/25/2002 12:00:00 AM | A | FAIL |
|
|
###-#### 5 4/25/2002 9:45:16 AMc/n posted. 4/25/2002 11:40:46 AM
|
BLD02-00106
| BLD-Final | 4/24/2002 | 4/25/2002 | 4/25/2002 12:00:00 AM | A | PART |
|
|
MARTIN ###-####. c/n posted. Ok for a temp oc, note all other signatures have signed perm except structural. 4/25/2002 12:22:13 PM
|
BLD02-00349
| BLD-Final | 4/24/2002 | 4/25/2002 | 4/25/2002 12:00:00 AM | A | PART |
|
|
JASON- ###-#### FN ok temp oc need fire caulking. 4/25/2002 4:46:05 PM
|
BLD02-00455
| BLD-Framing/Rough-in | 4/24/2002 | 4/25/2002 | 4/25/2002 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 04/24/2002 at 15:26:09. Contact: ###-####. Still needs truss details none found at site 2nd time i have looked for them another c/n posted. 4/25/2002 11:12:56 AM
|
BLD02-00870
| BLD-Footing | 4/25/2002 | 4/25/2002 | 4/25/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/25/2002 at 06:14:17. Contact: .
|
BLD02-00860
| BLD-Footing | 4/25/2002 | 4/25/2002 | 4/25/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/25/2002 at 06:16:17. Contact: .wip. 4/25/2002 10:18:23 AM
|
BLD02-00400
| BLD-Foundation | 4/25/2002 | 4/25/2002 | 4/25/2002 12:00:00 AM | P | PART |
|
|
###-#### PETE. Work in progress. vertical epoxied, horz rebar under hds, note told them to adjust hds as nessasary for shear walls. Note: This is a foundation left from burned house, The project should have been required to have a structural engineer to reveiw, and detail design. IE: concrete strength and connections at caped areas, connection to existing etc. But this was not required and work is being done as directed by our plan review division. 4/25/2002 3:35:00 PM
|
BLD01-02867
| BLD-Framing/Rough-in | 4/25/2002 | 4/25/2002 | 4/25/2002 12:00:00 AM | P | CANC |
|
|
fr insp- diane -###-#### work -call 15 min if possible before insp... Needs ele insp before frame, called owner and informed. 4/25/2002 1:58:15 PM
|
BLD02-00469
| BLD-Framing/Rough-in | 4/25/2002 | 4/25/2002 | 4/25/2002 12:00:00 AM | P | PART |
|
|
in basement -###-####- mike . fire blocking and connect a duct in hall lid. contractor on site no c/n posted. 4/25/2002 2:29:27 PM
|
BLD02-00539
| BLD-Footing | 4/25/2002 | 4/25/2002 | 4/25/2002 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 425 On 4/25/2002 10:26:38 AM wip. 4/25/2002 2:56:44 PM
|
BLD01-02798
| BLD-Framing/Rough-in | 4/25/2002 | 4/25/2002 | 4/25/2002 12:00:00 AM | P | PART |
|
|
suspended ceiling insp -###-#### jeff . need to add some wires to a few lights, contractor will recall for next day. 4/25/2002 3:47:58 PM
|
BLD01-00202
| BLD-Final | 4/25/2002 | 4/25/2002 | 4/25/2002 12:00:00 AM | P | PASS |
|
|
Ok for perm oc on schell/core. 4/25/2002 1:09:31 PM
|
BLD01-01778
| BLD-Footing | 4/24/2002 | 4/25/2002 | 4/25/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 04/24/2002 at 11:48:24. Contact: ###-####.
|