Inspections for the day of: Thursday, April 25, 2002.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC02-00916 Rough-in4/24/20024/25/20024/25/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/24/2002 at 13:53:02. Contact: ###-####. ceiling and s/f dampers ok 4/25/2002 10:58:07 AM
MEC02-01104 Pressure Test4/24/20024/25/20024/25/2002 12:00:00 AMAFAIL
re-insp pres test jeff ###-#### call 1st before insp
MEC02-00980 Final4/25/20024/25/20024/25/2002 12:00:00 AMPFAIL
###-#### BRYAN ..right on collister..right on briar hill 4/25/2002 12:30:13 PM leak 4/25/2002 3:59:06 PM
MEC02-01135 Pressure Test4/25/20024/25/20024/25/2002 12:00:00 AMPPASS
off apple..right on wright..right on west point 4/25/2002 12:35:18 PM
MEC02-01135 Rough-in4/25/20024/25/20024/25/2002 12:00:00 AMPPASS
###-#### KIM
MEC02-01136 Rough-in4/25/20024/25/20024/25/2002 12:00:00 AMPPASS
###-#### RANDY...gas ok as well 4/25/2002 2:04:05 PM
MEC02-01128 Final4/25/20024/25/20024/25/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/25/2002 at 10:04:19. Contact: ###-####....northview..right on joretta 4/25/2002 12:36:23 PM
MEC02-01128 Final4/25/20024/25/20024/25/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/25/2002 at 10:04:19. Contact: ###-####....northview..right on joretta 4/25/2002 12:36:23 PM
MEC02-01138 Final4/25/20024/25/20024/25/2002 12:00:00 AMPFAIL
###-#### furn only,,five mile past franklin..right on bridgetower..left on guard tower 4/25/2002 12:31:52 PM need comb air...talked to chris 4/25/2002 2:04:20 PM
MEC02-00793 Final4/25/20024/25/20024/25/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 04/25/2002 at 11:12:01. Contact: ###-####....orchard left on malad 4/25/2002 12:33:09 PM insulate metal in garage..complete supply in bath...no cards in site 4/25/2002 2:39:09 PM