BLD02-01925
| FIRE-Final Inspection | 4/23/2003 | 4/25/2003 | 4/25/2003 12:00:00 AM | A | PASS |
|
|
Fire life safety is OK. Fire alarm and fire sprinklers finaled 4/25/2003 10:32:36 AM
|
BLD02-01845
| FIRE-Final Inspection | 4/24/2003 | 4/25/2003 | 4/25/2003 12:00:00 AM | A | PASS |
|
|
dave; Phone #: ###-#### Life safety finaled 4/25/2003 2:41:32 PM
|
FIR01-00612
| INSP-Conference | 4/25/2003 | 4/25/2003 | 4/25/2003 12:00:00 AM | A | PASS |
|
|
Fire alarm system finaled
|
FIR02-00385
| INSP-Final Inspection | 4/25/2003 | 4/25/2003 | 4/25/2003 12:00:00 AM | A | PASS |
|
|
Phase 1 fire sprinklers finaled.
|
FIR02-00372
| INSP-Final Inspection | 4/23/2003 | 4/25/2003 | 4/25/2003 12:00:00 AM | A | FAIL |
|
|
Provide map for fire alarm system, remove old fire alarm equipment, reverify alarm signals 4/25/2003 9:57:45 AM
|
FIR03-00151
| INSP-Final Inspection | 4/23/2003 | 4/25/2003 | 4/25/2003 12:00:00 AM | P | FAIL |
|
|
MIKE; Phone #: ###-#### The duct smoke detectors do not shut down the hvac units. All devices including the duct smoke detectors due report to the panel and to central station. 4/25/2003 3:47:11 PM
|