BLD10-01205
| FIRE-Conference | 4/25/2011 | 4/25/2011 | 4/28/2011 4:13:43 PM | P | DONE |
|
|
Conversation with alarm contractor regarding panel status.
|
FIR11-00172
| INSP-Final Inspection | 4/22/2011 | 4/25/2011 | 4/26/2011 1:35:42 PM | P | PASS |
|
|
Fire alarm permit finaled. Inspection passed.
|
BLD11-00737
| FIRE-Final Inspection | 4/25/2011 | 4/25/2011 | 4/26/2011 1:33:56 PM | P | PASS |
|
|
Life safety passed. Added exit sign to be verified at structural final per agreement.
|
FIR11-00145
| INSP-Conference | 4/25/2011 | 4/25/2011 | 4/26/2011 1:31:19 PM | P | DONE |
|
|
Regarding appliance locations at the weight room, plan annotations, SD spacing.
|
BLD10-02356
| FIRE-Final Inspection | 4/25/2011 | 4/25/2011 | 4/26/2011 1:20:31 PM | P | PASS |
|
|
Fire life safety finaled.
|
FIR10-00569
| INSP-Final Inspection | 4/25/2011 | 4/25/2011 | 4/26/2011 1:19:28 PM | P | PASS |
|
|
Fire sprinkler permit work passed final inspection per T. Frost.
|
BLD11-00306
| FIRE-Conference | 4/25/2011 | 4/25/2011 | 4/26/2011 1:18:06 PM | P | DONE |
|
|
Regarding final inspection items.
|